Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Orange line improvement project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
2023 Capital Improvement Project - Phase 3. Separate Bids will be received for: General Construction, Electrical Work, and Mechanical Work.
Posted Date
Dec 9, 2025
Due Date
Jan 20, 2026
Release: Dec 9, 2025
Close: Jan 20, 2026
2023 Capital Improvement Project - Phase 3. Separate Bids will be received for: General Construction, Electrical Work, and Mechanical Work.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Central school district 2023 capital improvement project phase 3 electrical.
Posted Date
Jan 16, 2026
Due Date
Feb 4, 2026
Release: Jan 16, 2026
Close: Feb 4, 2026
Central school district 2023 capital improvement project phase 3 electrical.
AvailableProvide construction services which will consist of refurbishment and improvements at the Sanitary Sewer Pumping Station. Proposed work includes site work improvements, installation of new piping and equipment within the existing pump station structure and associated electrical and safety upgrades. Work to be completed shall include, but not be limited to, the following:Temporary bypass pumping of sewer flow during the construction project. Replacement of three (3) existing sewage pumps with new dry pit submersible pumps. Replacement of all fittings, pipes, valves in existing dry well structure. Installation of new control systems with SCADA integration. Installation of one (1) new comminutor on influent sewer. Replacement of all electrical components within the station. Installation of (2) two electric actuator valves and integration into pump control SCADA system for automated operation. Upgrades to existing intermediate level catwalk for improved access. Upgrades to station security by installation of electrically operated gates and installation of new security video cameras system. Demolition and removal of existing indoor generator. Furnishment and installation of new outdoor pad-mounted diesel-engine generator set. Site work including demolition, driveway and area paving reconstruction, modification to existing upstream sewer manhole, concrete pad reconstruction, fence replacement, and all other related site improvements. Architectural improvements to the pump station building including replacement of exterior doors, windows, trim, fascia, roofing, and ceiling.
Posted Date
Jan 12, 2026
Due Date
Feb 24, 2026
Release: Jan 12, 2026
Close: Feb 24, 2026
Provide construction services which will consist of refurbishment and improvements at the Sanitary Sewer Pumping Station. Proposed work includes site work improvements, installation of new piping and equipment within the existing pump station structure and associated electrical and safety upgrades. Work to be completed shall include, but not be limited to, the following:Temporary bypass pumping of sewer flow during the construction project. Replacement of three (3) existing sewage pumps with new dry pit submersible pumps. Replacement of all fittings, pipes, valves in existing dry well structure. Installation of new control systems with SCADA integration. Installation of one (1) new comminutor on influent sewer. Replacement of all electrical components within the station. Installation of (2) two electric actuator valves and integration into pump control SCADA system for automated operation. Upgrades to existing intermediate level catwalk for improved access. Upgrades to station security by installation of electrically operated gates and installation of new security video cameras system. Demolition and removal of existing indoor generator. Furnishment and installation of new outdoor pad-mounted diesel-engine generator set. Site work including demolition, driveway and area paving reconstruction, modification to existing upstream sewer manhole, concrete pad reconstruction, fence replacement, and all other related site improvements. Architectural improvements to the pump station building including replacement of exterior doors, windows, trim, fascia, roofing, and ceiling.
AvailableImprovement project for nature preserve park phase 1. The project involves: 7' wide ADA stone loop trail, asphalt trail, demo and replacement of pedestrian bridge, pedestrian boardwalk w/ platform, pavilion w/ concrete pad & picnic tables, nature-based play area, bike rack, trash receptacles, benches, signage, landscape improvements, parking lot demo, lawn restoration and e&s controls.
Posted Date
Dec 22, 2025
Due Date
Jan 27, 2026
Release: Dec 22, 2025
Close: Jan 27, 2026
Improvement project for nature preserve park phase 1. The project involves: 7' wide ADA stone loop trail, asphalt trail, demo and replacement of pedestrian bridge, pedestrian boardwalk w/ platform, pavilion w/ concrete pad & picnic tables, nature-based play area, bike rack, trash receptacles, benches, signage, landscape improvements, parking lot demo, lawn restoration and e&s controls.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →