Summary
Work consists of Replacement of existing concrete driveways, pads, and top slabs; Replacement of existing control panels and electrical components with new control panels and electrical components, and additional electrical improvements. Control panel to be procured by Owner and installed by Contractor; Replacement of existing site lighting (pole and lighting), and installation of new site lighting; Site work and restoration; Installation of temporary bypass pumping systems as needed for construction; Removal of existing pump, base elbows, guide rails, and other appurtenances and reinstallation of new pumps, base elbows, guide rails, and appurtenances. Pumps to be purchased by Owner and installed by Contractor; Replacement of existing pump access hatches with new access hatches; Replacement of wet well piping, valves, and fittings; Replacement of valve vault piping, valves, and fittings; Prep and coat all process piping and pumping system appurtenances in wet well and valve vault.; Prep and coat all interior walls of wet well and valve vault structures (Bid Alternates No. 1 and No. 2, respectively)
l. Other miscellaneous improvements as described in the Contract Documents.