Work consists of small structure replacement includes 135 CY of excavation, common; 868 SY of subgrade treatment, type ic; 262 TON of widening with HMA, type c; 334 SY of milling, asphalt, 1 1/2"; 2,554 SY of asphalt for tack coat; 332 LF of guardrail, mgs w-beam, 6 ft 3" spacing; 125 LF of milled HMA corrugations, sinusoidal; 1,092 SY of mulched seeding, type r; 918 SY of erosion control blanket; 4,540 LF of temporary pavement marking, removable, 6"; 410 LF of temporary traffic barrier, anchored, type 2; 2,430 LF of line, paint, solid, white, 6"; 2,590 LF of line, paint, solid, yellow, 6". See outside link & attached file.