Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Two (2) prefabricated metal buildings project
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide modular, prefabricated, and pre-engineered buildings and peripherals.
Posted Date
Nov 7, 2025
Due Date
Dec 17, 2025
Release: Nov 7, 2025
Close: Dec 17, 2025
Provide modular, prefabricated, and pre-engineered buildings and peripherals.
AvailablePremium
Access the largest public sector contact database
The work under this contract includes the provision and delivery of a prefabricated restroom building.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
The work under this contract includes the provision and delivery of a prefabricated restroom building.
AvailableRecommendations from interested manufacturers and suppliers regarding the standard specifications and drawings for prefabricated modular buildings.
Posted Date
Sep 25, 2024
Due Date
Dec 31, 2025
Release: Sep 25, 2024
Close: Dec 31, 2025
Recommendations from interested manufacturers and suppliers regarding the standard specifications and drawings for prefabricated modular buildings.
AvailableInstallation of a stable, level, and complete 20' x 30' prefabricated gazebo kit onto a prepared foundation at the designated location at the developmental center.
Posted Date
Dec 2, 2025
Due Date
Dec 23, 2025
Release: Dec 2, 2025
Close: Dec 23, 2025
Installation of a stable, level, and complete 20' x 30' prefabricated gazebo kit onto a prepared foundation at the designated location at the developmental center.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis