Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide precinct 1 - culvert head walls.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes approx 1 LS precast concrete box culvert sections, wingwalls and footings. See outside link.
Posted Date
Oct 29, 2025
Due Date
Feb 9, 2026
Release: Oct 29, 2025
Close: Feb 9, 2026
Work includes approx 1 LS precast concrete box culvert sections, wingwalls and footings. See outside link.
AvailablePremium
Access the largest public sector contact database
Work includes repair and rehabilitation of the existing culvert to restore structural integrity and hydraulic capacity. Major work elements include excavation and removal of damaged culvert sections; installation of new culvert structure; placement of streambed aggregate; roadway and shoulder restoration; installation of erosion and sediment control measures; and implementation of temporary traffic control.
Posted Date
Nov 13, 2025
Due Date
Dec 15, 2025
Release: Nov 13, 2025
Close: Dec 15, 2025
Work includes repair and rehabilitation of the existing culvert to restore structural integrity and hydraulic capacity. Major work elements include excavation and removal of damaged culvert sections; installation of new culvert structure; placement of streambed aggregate; roadway and shoulder restoration; installation of erosion and sediment control measures; and implementation of temporary traffic control.
AvailableReplace the existing deteriorating metal pipe culvert with a reinforced concrete box culvert.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Replace the existing deteriorating metal pipe culvert with a reinforced concrete box culvert.
AvailableState Project No. 2026-089-8F129 This Project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference. A.The work will be completed under one prime contract. B.The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract; Excavation and demolition of existing culvert structures; Stream restoration work involving natural materials and vegetation establishment; Fabricate, furnish, and install Aluminum Box Culvert Structure.; Erosion control, sediment control, and permanent vegetation establishment; Traffic control and permanent signage. See outside link.
Posted Date
Aug 21, 2025
Due Date
Sep 10, 2026
Release: Aug 21, 2025
Close: Sep 10, 2026
State Project No. 2026-089-8F129 This Project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference. A.The work will be completed under one prime contract. B.The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract; Excavation and demolition of existing culvert structures; Stream restoration work involving natural materials and vegetation establishment; Fabricate, furnish, and install Aluminum Box Culvert Structure.; Erosion control, sediment control, and permanent vegetation establishment; Traffic control and permanent signage. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis