Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide powerhouse 1 and 2 DC panel board replacement. This project involves the comprehensive replacement of specified electrical equipment across Powerhouse 1 and Powerhouse 2. The base scope for Powerhouse 1 includes the Main 125V DC Station Board, the Preferred AC Panel, and the Emergency Lighting Panel along with its associated Emergency Lighting Panel Transfer Switch. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The U.S. Army Corps of Engineers (USACE) - Tulsa District issued Sources Sought A038461 for a turnkey Design-Build contract to replace the existing built-up roof on the Ft. Gibson Powerhouse with a new 2-ply Modified Bituminous Membrane roofing system, including new roof drainage and optional guard rails and roof ladders. The contractor is expected to provide all design, investigation, materials, labor, equipment, and management required to complete the project. The opportunity was posted Dec 9, 2025 and is due Jan 9, 2026; the source listed is SAM.gov and the PIEE solicitation module link is provided for vendor access.
Posted Date
Dec 9, 2025
Due Date
Jan 9, 2026
Release: Dec 9, 2025
Close: Jan 9, 2026
The U.S. Army Corps of Engineers (USACE) - Tulsa District issued Sources Sought A038461 for a turnkey Design-Build contract to replace the existing built-up roof on the Ft. Gibson Powerhouse with a new 2-ply Modified Bituminous Membrane roofing system, including new roof drainage and optional guard rails and roof ladders. The contractor is expected to provide all design, investigation, materials, labor, equipment, and management required to complete the project. The opportunity was posted Dec 9, 2025 and is due Jan 9, 2026; the source listed is SAM.gov and the PIEE solicitation module link is provided for vendor access.
150 EA Bus bar #7 SLIV PRP panel 1 per panel 3 per car spec S-4488-4 DWG C-6216-B copper authority stock no. - 5901026R05.
Posted Date
Jan 7, 2026
Due Date
Jan 12, 2026
Release: Jan 7, 2026
Close: Jan 12, 2026
150 EA Bus bar #7 SLIV PRP panel 1 per panel 3 per car spec S-4488-4 DWG C-6216-B copper authority stock no. - 5901026R05.
Available10 EA DC/DC converters - through hole 100w 36 vin 5vout i grade mfr.: vicor mfr. #: vi-220-iw mouser #: 492-vi-220-iw or approved equivalent.
Posted Date
Jan 6, 2026
Due Date
Jan 9, 2026
Release: Jan 6, 2026
Close: Jan 9, 2026
10 EA DC/DC converters - through hole 100w 36 vin 5vout i grade mfr.: vicor mfr. #: vi-220-iw mouser #: 492-vi-220-iw or approved equivalent.
Provide panel,sonar gtc. NSN 1H-5845-015938990-ST, TDP VER 006, QTY 2 EA.
Posted Date
Nov 27, 2025
Due Date
Jan 20, 2026
Release: Nov 27, 2025
Close: Jan 20, 2026
Provide panel,sonar gtc. NSN 1H-5845-015938990-ST, TDP VER 006, QTY 2 EA.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis