Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
U.S. Army Engineer District Omaha
Provide powerhouse 1 and 2 DC panel board replacement. This project involves the comprehensive replacement of specified electrical equipment across Powerhouse 1 and Powerhouse 2. The base scope for Powerhouse 1 includes the Main 125V DC Station Board, the Preferred AC Panel, and the Emergency Lighting Panel along with its associated Emergency Lighting Panel Transfer Switch. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
U.S. Army Engineer District Omaha
Replace the entire line-up in Powerhouse 1 and Powerhouse 2 Powerhouse 1. Replace the Main 125V DC Station Board Panel (including all DC and preferred AC). Replace the Preferred AC Panel (located in the same location as the DC Station Board). See attached file.
Posted Date
-
Due Date
Dec 1, 2025
U.S. Army Engineer District Omaha
Close: Dec 1, 2025
Replace the entire line-up in Powerhouse 1 and Powerhouse 2 Powerhouse 1. Replace the Main 125V DC Station Board Panel (including all DC and preferred AC). Replace the Preferred AC Panel (located in the same location as the DC Station Board). See attached file.
AvailableSoutheastern Pennsylvania Transportation Authority
2 EA Ceiling panel N75016-18.
Posted Date
Nov 13, 2025
Due Date
Nov 18, 2025
Release: Nov 13, 2025
Southeastern Pennsylvania Transportation Authority
Close: Nov 18, 2025
2 EA Ceiling panel N75016-18.
Los Angeles County Metro Transit Authority
Metro p/n: 191730 description: switch - mirror adjuster, remote, 12v lighted, 1.330" x 1.330", console panel 2 approved mfr: rosco, inc. Approved mfg#: sw-1.
Posted Date
May 1, 2025
Due Date
May 8, 2028
Release: May 1, 2025
Los Angeles County Metro Transit Authority
Close: May 8, 2028
Metro p/n: 191730 description: switch - mirror adjuster, remote, 12v lighted, 1.330" x 1.330", console panel 2 approved mfr: rosco, inc. Approved mfg#: sw-1.
AvailableSoutheastern Pennsylvania Transportation Authority
2 ea ceiling panel n75016-18 or equal.
Posted Date
Nov 5, 2025
Due Date
Nov 18, 2025
Release: Nov 5, 2025
Southeastern Pennsylvania Transportation Authority
Close: Nov 18, 2025
2 ea ceiling panel n75016-18 or equal.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis