Project consist (pool construction - contract #1); of the climbing wall (provided by owner), incidental demolition, excavation, bedrock removal, fill, filter fabric, grading, limited site work, concrete swimming pool and deep manhole construction, concrete culvert, concrete deck, deck drains and deck drain piping to deep manhole, deck equipment, shade structures, tot slide, deck slide, and 1-meter diving board stand assembly. Painting, electrical bonding (pool perimeter bonding conductor), and miscellaneous work. (POOL MECHANICAL CONSTRUCTION - CONTRACT #2); includes grading, limited site work, process piping, recirculation systems, pumps, pool water features, below and above-grade piping, disinfectant systems, filter systems, precast concrete containment tanks, manhole and backwash tank dewatering systems, MH #1 force main receptor, chemical controller, electrical bonding (mechanical equipment bonding conductor) and miscellaneous Work. (GENERAL CONSTRUCTION - CONTRACT #3); includes fence demolition, parking lot replacement, excavation, fill, site grading, fine grading, seeding, erosion control, site security fencing, chain link fencing, construction of a bathhouse with pool mechanical room, concrete work, curb and sidewalk, water service, yard hydrants, site utilities, HVAC system, DWV piping, backwash force main receptor electrical, safety equipment, and miscellaneous work.
Available