Retrieving RFP details
Release
Close
City of Dade City
The project involves the rejuvenation and consolidation of two existing stormwater ponds, including excavation, cleaning, regrading, landscaping, and fencing work to improve stormwater management, site safety, and aesthetics. The work shall include the following tasks: 1. Removal of existing berm. - Remove the existing berm-style wall separating the two stormwater ponds to allow consolidation into a single, larger pond. See attached file for full scope.
Pond Avenue - Stormwater Pond Bid
Central Texas Regional Mobility Authority
project will upgrade the existing WQ pond bedding from stone riprap to concrete riprap, replaces existing gabions and maintains the berms & sand filtration pond. 599 CY 6 Install 5" Concrete Riprap with toe wall; 1,135 SY 7 Excavation of Sand Filter Bed (4"); Setup Erosion Control;
City of Eagle Lake
Work includes Install silt fence and construction entrance.Provide survey layout and as-builts. Provide dewatering as necessary. Excavate and haul off approximately 3,234 cy of in situ soils and grade the pond expansion as shown on the plans. Install approximately 442 lf of 5 chain link fencing. Provide restoration of damaged sod or paving.
Town of Whitewright
Work consists of remove pond island; installation of culverts for flood and erosion control; install fountain; pond maintenance plan; dredge out overflow silt pond.
Release
Oct 19, 2025
Close
Dec 04, 2025