Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide addressing food insecurity project, covering vehicles (van and utility vehicle).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide construction services for the tiny town homeless shelter project.
Posted Date
Oct 14, 2025
Due Date
Feb 6, 2026
Release: Oct 14, 2025
Close: Feb 6, 2026
Provide construction services for the tiny town homeless shelter project.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Jan 9, 2026
Close: Jan 27, 2026
Provide county health department project.
AvailableThe City of King (King City), CA is soliciting bids for the 2025 CDBG Pavement Rehabilitation Project to perform pavement rehabilitation on several street segments, including digouts, adjustment of utility covers, cold planing, HMA leveling and surface courses, cape seal, striping, and markings. The project is funded by a Community Development Block Grant (CDBG) and must comply with applicable federal and state provisions, including prevailing wage and bonding requirements; contract time is 40 working days from notice to proceed. Bids were posted with an open date of 2025-12-22 and a close date of 2026-02-05 (the posting was last updated 2025-12-24), and contact for the bid is Octavio Hurtado (ohurtado@kingcity.com, 831-385-3281 ext 5927).
Posted Date
Dec 22, 2025
Due Date
Feb 5, 2026
Release: Dec 22, 2025
Close: Feb 5, 2026
The City of King (King City), CA is soliciting bids for the 2025 CDBG Pavement Rehabilitation Project to perform pavement rehabilitation on several street segments, including digouts, adjustment of utility covers, cold planing, HMA leveling and surface courses, cape seal, striping, and markings. The project is funded by a Community Development Block Grant (CDBG) and must comply with applicable federal and state provisions, including prevailing wage and bonding requirements; contract time is 40 working days from notice to proceed. Bids were posted with an open date of 2025-12-22 and a close date of 2026-02-05 (the posting was last updated 2025-12-24), and contact for the bid is Octavio Hurtado (ohurtado@kingcity.com, 831-385-3281 ext 5927).
AvailableWork includes procure 30' x 60' timber frame pavilion kit (size can vary slightly if necessary) there is no preferred vendor, but the manufacturer must be located within the united states to meet grant requirements min 1,800 SF coverage area with shingles and gable roof design; kit must include all structural timbers, hardware, roofing materials, and assembly hardware; existing slab removal: demolish and remove existing concrete pad (56' x 63. 5', approx 3,556 SF); saw cut existing slab as necessary to minimize damage to adjacent areas; remove all concrete debris, reinforcement, and related materials from site; dispose of all demolition materials at approved facilities per local regulations. See attached file.
Posted Date
Dec 11, 2025
Due Date
Jan 29, 2026
Release: Dec 11, 2025
Close: Jan 29, 2026
Work includes procure 30' x 60' timber frame pavilion kit (size can vary slightly if necessary) there is no preferred vendor, but the manufacturer must be located within the united states to meet grant requirements min 1,800 SF coverage area with shingles and gable roof design; kit must include all structural timbers, hardware, roofing materials, and assembly hardware; existing slab removal: demolish and remove existing concrete pad (56' x 63. 5', approx 3,556 SF); saw cut existing slab as necessary to minimize damage to adjacent areas; remove all concrete debris, reinforcement, and related materials from site; dispose of all demolition materials at approved facilities per local regulations. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →