Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of La Porte
The Project consists of the decommissioning of a steel packaged dry pit wastewater lift station and replacing with a duplex submersible municipal lift station. Included is the installation of a new wet well, valve vault, control panel, vent, bypass connection and site restoration. In addition, the contract includes the installation of approx. 1250 LF of HDPE sanitary force main by directional drill methods, and other appurtenant work within the City of La Porte. There is an Alternate for this project that consists of purchasing a multi-phase industrial towable standby generator.
Posted Date
Jul 24, 2026
Due Date
Aug 14, 2026
Release: Jul 24, 2026
City of La Porte
Close: Aug 14, 2026
The Project consists of the decommissioning of a steel packaged dry pit wastewater lift station and replacing with a duplex submersible municipal lift station. Included is the installation of a new wet well, valve vault, control panel, vent, bypass connection and site restoration. In addition, the contract includes the installation of approx. 1250 LF of HDPE sanitary force main by directional drill methods, and other appurtenant work within the City of La Porte. There is an Alternate for this project that consists of purchasing a multi-phase industrial towable standby generator.
AvailableCity of La Porte
Provide construction of a parking lot. 1 LS construction engineering; 1 LS mobilization and demobilization; 1 LS erosion and sediment control; 1 LS maintaining traffic, clear lake blvd; 1,954 CYS common excavation; 2,208 CYS B borrow; 13,223 SYS subgrade treatment, type III; 106 LFT curb and gutter, concrete, remove; 2,778 LFT curb and gutter, concrete, type B; 42 LFT curb integral concrete, type B; 13 EA concrete parking block; 7 EA accessible parking signs; 722 SYS sidewalk, concrete. See outside link.
Posted Date
May 8, 2026
Due Date
May 26, 2026
Release: May 8, 2026
City of La Porte
Close: May 26, 2026
Provide construction of a parking lot. 1 LS construction engineering; 1 LS mobilization and demobilization; 1 LS erosion and sediment control; 1 LS maintaining traffic, clear lake blvd; 1,954 CYS common excavation; 2,208 CYS B borrow; 13,223 SYS subgrade treatment, type III; 106 LFT curb and gutter, concrete, remove; 2,778 LFT curb and gutter, concrete, type B; 42 LFT curb integral concrete, type B; 13 EA concrete parking block; 7 EA accessible parking signs; 722 SYS sidewalk, concrete. See outside link.
City of La Porte
Roadway infrastructure improvements.
Posted Date
May 8, 2026
Due Date
May 29, 2026
Release: May 8, 2026
City of La Porte
Close: May 29, 2026
Roadway infrastructure improvements.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Partner with the relevant department head to craft a continuity/uniqueness justification; pre-brief the Board of Public Works & Safety before any formal action.
Coops: note they’re not used today; suggest exploring OMNIA Partners or NASPO ValuePoint as future options.
Entity: City of La Porte, IN.
Best path today: Position your solution as specialized/essential for continuity. Work directly with the relevant department head (e.g., City Engineer Nick Minich for infrastructure) to build the business case and sole-source justification.
Board meetings and strategic plans from City of La Porte
The meeting included a discussion on public comment procedures, where a motion to remove it from the agenda was denied. The Chief provided updates regarding the swearing-in of new officers, pre-basic training schedules, police recruit enrollment, and ongoing medical stress tests for staff. Additionally, a proposal to change the meeting time was reviewed and ultimately rejected, maintaining the current schedule.
The Council discussed the introduction of a petition for voluntary annexation regarding a parcel of land intended to serve as a buffer for the Microsoft Project area. Public comments addressed concerns regarding police staffing levels, fireworks enforcement, traffic safety, and the findings of a local mental health survey. Legislative actions included the adoption of ordinances establishing a four-way stop at the intersection of Rumely Street and Jefferson Avenue, a no-parking zone on Tyler Street, and the vacation of an alleyway in the Andrews Addition. Additionally, a resolution was adopted to establish multiple READi 2.0 grant funds to support local affordable housing development, neighborhood reinvestment, and YMCA facilities. Boy Scout Troop 321 was recognized for their community service.
The commission reviewed a proposal for signage recognizing the local Pop Warner Championship, which was supported pending state department approval. Other agenda items included a request to memorialize a roadway for the local American Legion, as well as an extensive discussion regarding downtown parking management and time allowances. The commission also received status updates on the Slicer Pathway project, safety concerns at the intersection of US35 and Boyd Boulevard, and the proposed one-way designation for M Street.
The commission addressed several traffic-related matters, including the recommendation for an alley vacation, enforcement of 'No Parking' zones to improve safety, and potential traffic calming measures near schools and intersections. They approved a one-way street designation for Wabash Street and authorized the installation of a special needs awareness sign on Holcomb Street. Various infrastructure projects, such as the Slicer Pathway and traffic control signage, were also reviewed, with some matters tabled for future investigation or revisiting after construction projects.
The commission discussed the placement of Pop Warner signage and determined that local roads are more appropriate than state-owned roadways. A proposal to honorarily rename a street after Hamon Gray was approved for submission to the City Council. The meeting included a review of parking time regulations and downtown parking capacity, as well as a request to suspend parking limits during construction. Discussions also covered updating the downtown parking guide, ongoing safety projects, and the rescheduling of a future meeting.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of La Porte's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge