Summary
Work consists of 3-million gallon culinary water storage tank will be constructed on the east side of i-15 adjacent to the existing department of corrections administration building. The work will include demolition of 2 existing concrete tanks, excavation of the tank site, metering vaults, apprentice waterlines 16" and 30" to feed and distribute water to the point development. The work also includes inlet and outlet vault structures, metering vault structure, approximately 1,300 linear feet of 30" and 12" ductile iron piping, SCADA,, yard piping and restoration of existing sidewalks, roadways etc. Also includes 33,200 CY of excavation; 1000 CY of rock excavation allowance; 270 TON of hot mix asphalt (hma); include the purchase, delivery, and installation of 4" of rock mulch.