Summary
40ft x 80 ft Pre-Engineered Building Package; 2 ft x 4 ft concrete piers where
columns are located, 1⁄2” rebar; Faux Rock Paneling around outside perimeter of building from bottom of structure to bot tom of windows. 5" concrete floor.
All outside walls and roof spray foam insulated. All inside walls rolled fiber-
glass insulated. "Training area" inside walls sheet metal liners 10 ft side walls "Training area" flooring concrete. "Training area" HVAC unit and
gas heat. "Office/Bathroom/Kitchen", walls sheet-rocked and painted.
"Office/Bathroom/Kitchen" flooring epoxy. "Office/Bathroom/Kitchen"
mini-split heat & air. "Office/Bathroom/Kitchen/Roof "decked with 3/4" plywood.
"Kitchen Area" staircase built on SW Corner.