Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide cleaner air to the building by adding bi-polar ionization and better filtration. Work shall include but not be limited to replacing the existing air handler AH-J1. Remove and replace existing air handler and accessories as outlined in the construction documents and modify ductwork and piping as required for connection to new equipment. Including but not limited to replacing chilled water control valve and outside air damper. The contractor shall replace the end suction pump associated with building and accessories as outlined in the construction documents and modify piping as required for connection to new pump. The contractor shall re-insulate all ductwork in the mechanical room associated with the replaced AHUs, including supply air, return air, outside air, and mixed air ducts as applicable. All VAV boxes shall be replaced and new thermostats provided and installed as noted on plans. All ductwork shall be cleaned. Add ductless spit system to electrical room.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Middle school hvac upgrades.
Posted Date
Dec 5, 2025
Due Date
Jan 6, 2026
Release: Dec 5, 2025
Close: Jan 6, 2026
Middle school hvac upgrades.
AvailableHVAC Upgrades at the Administration Offices .
Posted Date
Dec 11, 2025
Due Date
Dec 23, 2025
Release: Dec 11, 2025
Close: Dec 23, 2025
HVAC Upgrades at the Administration Offices .
AvailableAuditorium HVAC Upgrades at High School.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Close: Dec 16, 2025
Auditorium HVAC Upgrades at High School.
AvailableWork includes AHU replacements and HVAC upgrades.
Posted Date
Jul 30, 2025
Due Date
Dec 18, 2025
Release: Jul 30, 2025
Close: Dec 18, 2025
Work includes AHU replacements and HVAC upgrades.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis