Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project includes the complete roof system removal and replacement of the planetarium upper dome roof. Work for this project includes the removal of all existing roofing, edge metal, equipment curbs, insulation down to the roof deck, equipment and conduit. Work also includes the installation of new roof insulation throughout, a new kee roofing system, new edge metal, vents and equipment curbs.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide renovation dome including removal of existing projector screen, infill center opening, architectural finish improvements. Scope includes new basement server room, electrical and mechanical improvements along with a new exterior chiller.
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Provide renovation dome including removal of existing projector screen, infill center opening, architectural finish improvements. Scope includes new basement server room, electrical and mechanical improvements along with a new exterior chiller.
AvailableThe Missouri Department of Transportation (MoDOT) issued an Invitation for Bid to replace the roof on the NW Cameron salt dome, requiring removal of existing polyurethane foam roofing, three-tab shingles, felt underlayment, vents, flashing and entrance fascia, and installation of a complete watertight roof system including 30-year architectural shingles, synthetic underlayment, galvanized flashing, and metal roof vents. The period of performance requires completion by February 10, 2026 and the procurement is an IFB for construction services (not a grant). Bids are due February 10, 2026; this posting describes a single, discrete MoDOT solicitation (isSingleRfp = true).
Posted Date
Jan 13, 2026
Due Date
Feb 10, 2026
Release: Jan 13, 2026
Close: Feb 10, 2026
Roof Replacement.
Posted Date
Jan 20, 2026
Due Date
Feb 19, 2026
Release: Jan 20, 2026
Close: Feb 19, 2026
Roof Replacement.
AvailableRoof replacement.
Posted Date
Jan 15, 2026
Due Date
Feb 4, 2026
Release: Jan 15, 2026
Close: Feb 4, 2026
Roof replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Missouri Department of Transportation (MoDOT) issued an Invitation for Bid to replace the roof on the NW Cameron salt dome, requiring removal of existing polyurethane foam roofing, three-tab shingles, felt underlayment, vents, flashing and entrance fascia, and installation of a complete watertight roof system including 30-year architectural shingles, synthetic underlayment, galvanized flashing, and metal roof vents. The period of performance requires completion by February 10, 2026 and the procurement is an IFB for construction services (not a grant). Bids are due February 10, 2026; this posting describes a single, discrete MoDOT solicitation (isSingleRfp = true).