Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work will include safeguarding fourteen (14) new features and two (2) maintenance features employing a variety of closure methods.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Mineral Mountain Mine Closure Project.
Posted Date
Dec 10, 2025
Due Date
Mar 26, 2026
Release: Dec 10, 2025
Close: Mar 26, 2026
Mineral Mountain Mine Closure Project.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The State of Colorado Division of Reclamation, Mining and Safety (DRMS) issued an Invitation for Bids to close and reclaim the Mineral Mountain Mine. The contractor will provide all labor, materials, and services including mobilization/demobilization, a Project Safety/Health/Environmental Action Plan, sediment control (over ~425 linear feet), and installation of mine closures (machine backfill, polyurethane foam, monolithic plugs, etc.). The contract must be completed within 40 calendar days from Notice to Proceed and requires bid guarantee and performance/payment bonds along with required insurance and other documents.
Posted Date
Dec 10, 2025
Due Date
Mar 25, 2026
Release: Dec 10, 2025
Close: Mar 25, 2026
The State of Colorado Division of Reclamation, Mining and Safety (DRMS) issued an Invitation for Bids to close and reclaim the Mineral Mountain Mine. The contractor will provide all labor, materials, and services including mobilization/demobilization, a Project Safety/Health/Environmental Action Plan, sediment control (over ~425 linear feet), and installation of mine closures (machine backfill, polyurethane foam, monolithic plugs, etc.). The contract must be completed within 40 calendar days from Notice to Proceed and requires bid guarantee and performance/payment bonds along with required insurance and other documents.
AvailableThe USDA Forest Service, Custer Gallatin National Forest issued a sources-sought notice seeking contractors to perform mine waste remediation for the Riley Pass Bluff B Mine Reclamation Project in Harding County, SD. The project involves mobilization, surveying, erosion control, and excavation of hazardous mine waste, requiring all personnel to have OSHA 40-hour HAZWOPER training. Interested vendors must submit a two-page capability statement by January 29, 2026, for this project estimated between $1 million and $5 million.
Posted Date
Jan 22, 2026
Due Date
Jan 29, 2026
Release: Jan 22, 2026
Close: Jan 29, 2026
The USDA Forest Service, Custer Gallatin National Forest issued a sources-sought notice seeking contractors to perform mine waste remediation for the Riley Pass Bluff B Mine Reclamation Project in Harding County, SD. The project involves mobilization, surveying, erosion control, and excavation of hazardous mine waste, requiring all personnel to have OSHA 40-hour HAZWOPER training. Interested vendors must submit a two-page capability statement by January 29, 2026, for this project estimated between $1 million and $5 million.
Design-build: provide site design and construction to mitigate the wise hill underground coal mine fire and stabilize the slope to reduce the hazards to the public and environment.
Posted Date
Nov 12, 2025
Due Date
Feb 2, 2026
Release: Nov 12, 2025
Close: Feb 2, 2026
Design-build: provide site design and construction to mitigate the wise hill underground coal mine fire and stabilize the slope to reduce the hazards to the public and environment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →