Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Mineral Mountain Mine Closure Project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The State of Colorado Division of Reclamation, Mining and Safety (DRMS) issued an Invitation for Bids to close and reclaim the Mineral Mountain Mine. The contractor will provide all labor, materials, and services including mobilization/demobilization, a Project Safety/Health/Environmental Action Plan, sediment control (over ~425 linear feet), and installation of mine closures (machine backfill, polyurethane foam, monolithic plugs, etc.). The contract must be completed within 40 calendar days from Notice to Proceed and requires bid guarantee and performance/payment bonds along with required insurance and other documents.
Posted Date
Dec 10, 2025
Due Date
Mar 25, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Mar 25, 2026
The State of Colorado Division of Reclamation, Mining and Safety (DRMS) issued an Invitation for Bids to close and reclaim the Mineral Mountain Mine. The contractor will provide all labor, materials, and services including mobilization/demobilization, a Project Safety/Health/Environmental Action Plan, sediment control (over ~425 linear feet), and installation of mine closures (machine backfill, polyurethane foam, monolithic plugs, etc.). The contract must be completed within 40 calendar days from Notice to Proceed and requires bid guarantee and performance/payment bonds along with required insurance and other documents.
AvailableWork will include safeguarding fourteen (14) new features and two (2) maintenance features employing a variety of closure methods.
Posted Date
Dec 10, 2025
Due Date
Feb 11, 2026
Release: Dec 10, 2025
Close: Feb 11, 2026
Work will include safeguarding fourteen (14) new features and two (2) maintenance features employing a variety of closure methods.
AvailableDesign-build: provide site design and construction to mitigate the wise hill underground coal mine fire and stabilize the slope to reduce the hazards to the public and environment.
Posted Date
Nov 12, 2025
Due Date
Feb 2, 2026
Release: Nov 12, 2025
Close: Feb 2, 2026
Design-build: provide site design and construction to mitigate the wise hill underground coal mine fire and stabilize the slope to reduce the hazards to the public and environment.
AvailableMine reclamation. This work requires handling of mine waste that may present an imminent and substantial endangerment to human health and the environment.
Posted Date
Jan 22, 2026
Due Date
Jan 29, 2026
Release: Jan 22, 2026
Close: Jan 29, 2026
Mine reclamation. This work requires handling of mine waste that may present an imminent and substantial endangerment to human health and the environment.