Summary
Mid-Block Crosswalks Project. The project includes concrete pavement demolition, asphalt roadway paving, traffic line striping, ADA ramp construction, installation of pedestrian crossing signage and associated electrical work. proposing to improve the existing mid-block crosswalks across Pike Street and upgrade the pedestrian crossing signals. In general, the work consists of, but is not limited to, demolition of existing concrete crosswalk pavement, removal and disposal of existing crosswalk signage and equipment, removal and disposal of parking meters, parking line striping removal, thermoplastic line striping and pavement markings, installation of wireless solar rectangular rapid flashing beacon (RRFB) assemblies on existing and new poles, installation of advanced pedestrian warning signs, construction of ADA curb ramps, concrete sidewalk replacement, concrete curb replacement, and full depth pavement restoration.