Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Pike Construction Services is soliciting certified NYS M/WBE/SDVOB subcontractors and vendors to replace trench drains at the Rochester Genesee Regional Transportation Authority (RGRTA) facility at 588 Trabold Rd, Rochester, NY. Work includes removing existing trench frames/grates, sawcutting and removing surrounding concrete, installing new frames/grates rated for 12,500 lb vehicle loads, and pouring/finishing 4000 psi concrete to match existing floor grade. Prevailing wage applies; contracting goals encourage MBE/WBE/SDVOB participation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replace a trench drain at the east most service bay within RTS Access service garage facility.
Posted Date
Jan 16, 2026
Due Date
Feb 13, 2026
Release: Jan 16, 2026
Close: Feb 13, 2026
Replace a trench drain at the east most service bay within RTS Access service garage facility.
AvailableInstall an oil water separator and repair existing sections of trench drains at the Syracuse facility.
Posted Date
Jan 12, 2026
Due Date
Feb 9, 2026
Release: Jan 12, 2026
Close: Feb 9, 2026
Install an oil water separator and repair existing sections of trench drains at the Syracuse facility.
AvailableMoDOT is soliciting bids to remove and replace approximately 96 feet of trench drain at the Northwest District’s Lathrop Maintenance Building. Work includes saw‑cutting and removing concrete on both sides of the existing drain, removing necessary subgrade, and removing a short run of embedded sanitary piping to connect to a catch basin. A mandatory site visit is required and the project supports proper drainage and facility operations.
Posted Date
-
Due Date
Feb 4, 2026
Close: Feb 4, 2026
MoDOT is soliciting bids to remove and replace approximately 96 feet of trench drain at the Northwest District’s Lathrop Maintenance Building. Work includes saw‑cutting and removing concrete on both sides of the existing drain, removing necessary subgrade, and removing a short run of embedded sanitary piping to connect to a catch basin. A mandatory site visit is required and the project supports proper drainage and facility operations.
The Central New York Regional Transportation Authority (CNYRTA) solicits bids to install a new oil-water separator and repair existing trench drains at its Syracuse facility to ensure proper drainage and environmental compliance. The procurement is issued as an IFB (Ref. 2026-04-GR) with a one-time performance period and an expected completion date in early 2025 for the work at 200 Cortland Ave., Syracuse, NY 13205. Mandatory bonding requirements are noted (5% bid bond; 100% performance bond; 50% payment bond) and the Bonfire posting includes supporting documents (IFB and Attachment A drawings/specifications) that require a Bonfire account to download.
Posted Date
Jan 12, 2026
Due Date
Feb 9, 2026
Release: Jan 12, 2026
Close: Feb 9, 2026
The Central New York Regional Transportation Authority (CNYRTA) solicits bids to install a new oil-water separator and repair existing trench drains at its Syracuse facility to ensure proper drainage and environmental compliance. The procurement is issued as an IFB (Ref. 2026-04-GR) with a one-time performance period and an expected completion date in early 2025 for the work at 200 Cortland Ave., Syracuse, NY 13205. Mandatory bonding requirements are noted (5% bid bond; 100% performance bond; 50% payment bond) and the Bonfire posting includes supporting documents (IFB and Attachment A drawings/specifications) that require a Bonfire account to download.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis