Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Approx 65 CY asphalt concrete base, PG64-22, (449); 125 CY aggregate base; 64 gal tack coat; 49 CY asphalt concrete surface course, type 1, (449), PG64-22; etc. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 1,477 SY transverse grooving, 2,005 LF 30" steel pipe piling, wall thickness 0. 500", 1,880 LF 20" steel pipe piling, wall thickness 0.500", 1,193 LF 80' prestressed concrete beam, type fib-36 995 LF prestressed concrete beam, type fib-36, 137,144 pounds reinforcement, 5,191 pounds reinforcement, corrosion resistant, 886 LF concrete railing, 36", 698 ton loose riprap, size 300, 644 SY geotextile under riprap, 463 CY bridge concrete, class bdx, 149 CY bridge concrete, class aa 98 LF preformed joint seal, type i, 1,104 ton 9. 5-mm, st, asphalt pavement. See attached file.
Posted Date
Oct 6, 2025
Due Date
Jan 27, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 27, 2026
Work includes 1,477 SY transverse grooving, 2,005 LF 30" steel pipe piling, wall thickness 0. 500", 1,880 LF 20" steel pipe piling, wall thickness 0.500", 1,193 LF 80' prestressed concrete beam, type fib-36 995 LF prestressed concrete beam, type fib-36, 137,144 pounds reinforcement, 5,191 pounds reinforcement, corrosion resistant, 886 LF concrete railing, 36", 698 ton loose riprap, size 300, 644 SY geotextile under riprap, 463 CY bridge concrete, class bdx, 149 CY bridge concrete, class aa 98 LF preformed joint seal, type i, 1,104 ton 9. 5-mm, st, asphalt pavement. See attached file.
AvailableThe Ohio Department of Transportation (ODOT), District 11, is soliciting construction work to replace the superstructure of the West 3rd Street Bridge (PID 116211) over Big Stillwater Creek in Uhrichsville, Tuscarawas County, Ohio, including new approach slabs, backwalls, drainage, guardrail upgrades, erosion control, and related traffic control. The contract includes a DBE goal of 9.50% and an expected construction completion date of September 30, 2026; construction is planned to begin in spring/April 2026. Bidding/letting information shows the opportunity was posted in early January 2026 and the response/bid deadline falls in mid–February 2026, so the solicitation is open/active as of 2026-01-08.
Posted Date
Jan 2, 2026
Due Date
Feb 19, 2026
Release: Jan 2, 2026
Close: Feb 19, 2026
The Ohio Department of Transportation (ODOT), District 11, is soliciting construction work to replace the superstructure of the West 3rd Street Bridge (PID 116211) over Big Stillwater Creek in Uhrichsville, Tuscarawas County, Ohio, including new approach slabs, backwalls, drainage, guardrail upgrades, erosion control, and related traffic control. The contract includes a DBE goal of 9.50% and an expected construction completion date of September 30, 2026; construction is planned to begin in spring/April 2026. Bidding/letting information shows the opportunity was posted in early January 2026 and the response/bid deadline falls in mid–February 2026, so the solicitation is open/active as of 2026-01-08.
AvailableWork includes clearing and grubbing, 1,946 SY removal of asphalt pavement, all depths, 2 EA removal of bridge, 670 SY removal of concrete pavement w/ variable depth overlay, 1,210 LF removal of curb & gutter, all types, 312 LF removal of gravity sewer line, all sizes, all types, 1 EA removal of gravity sewer manhole, all sizes, all types, 93 LF removal of guard rail double faced rail including rail & posts, 326 LF removal of guard rail, including rails, posts and terminal ends, 2 EA removal of and replacement of low mast lighting assembly. See attached file.
Posted Date
Oct 6, 2025
Due Date
Jan 27, 2026
Release: Oct 6, 2025
Close: Jan 27, 2026
Work includes clearing and grubbing, 1,946 SY removal of asphalt pavement, all depths, 2 EA removal of bridge, 670 SY removal of concrete pavement w/ variable depth overlay, 1,210 LF removal of curb & gutter, all types, 312 LF removal of gravity sewer line, all sizes, all types, 1 EA removal of gravity sewer manhole, all sizes, all types, 93 LF removal of guard rail double faced rail including rail & posts, 326 LF removal of guard rail, including rails, posts and terminal ends, 2 EA removal of and replacement of low mast lighting assembly. See attached file.
AvailableDESIGN-BUILD: Bridge replacement of the superstructure and rehabilitation of the substructure of bridge 10.
Posted Date
Jan 16, 2026
Due Date
Mar 3, 2026
Release: Jan 16, 2026
Close: Mar 3, 2026
DESIGN-BUILD: Bridge replacement of the superstructure and rehabilitation of the substructure of bridge 10.