Summary
Project includes the construction of a new 5,350 sf pre-engineered building structure along with exterior improvements to an undeveloped site to serve as a physical therapy clinic. Bid packages for bid group no. 01: 3.0 building concrete; 4.0 masonry; 6.4 millwork; 7.0 sealants, water & air barriers; 7.2 fiber cement siding; 8.0 doors, frames and hardware; 8.1 aluminum doors, framing and glazing; 8.2 overhead doors; 9.0 framing, drywall, & acoustical; 9.1 tiling; 9.2 resilient flooring & base; 9.3 bed, tape, & paint; 10.0 misc. specialties; 10.4 signage; 10.5 covered walkway; 11.0 appliances; 13.0 metal building supply; 13.1 metal building erections; 13.2 metal building turnkey; 22.0 plumbing; 23.0 HVAC; 24.0 total mechanical (hvac & plumbing); 26.0 electrical, fire alarm & communications; 31.0 earthwork; 32.0 paving; 32.2 landscaping & irrigation; 33.0 site utilities.