Summary
: installation of new water meter pits, replacing goosenecks and corp stops containing lead with updated saddles, replacing public galvanized service lines from water mainlines to the water meter pit and private galvanized service lines from the water meter pit to residential and commercial premises whose owner(s) consent for the work to be done with updated poly pipe. The work also includes installing isolation valves at intersections as well as replacing all disturbed asphalt, curb and gutter, sidewalk, sod, landscaping, and any other disturbed features. Trenchless removal and installation are the preferred and anticipated methods for this project unless otherwise specified in the plans.