Summary
Construction includes site concrete and utility connections including a new basement stair and a backflow prevention vault. Demolition will include interior partitions, mpe lines and finishes on the main depot and basement, plus removal of existing roof coverings and flashings. Window and door renovation includes removal of sash for refinishing and re-glazing, as required, with eight (8) openings requiring new frames or some remediation. Mechanical system is a forced air with a remote compressor, the electrical system is a 400 amp service. Bids will reflect individual amounts for the eight (8) primary work groups: 1) site concrete; 2) demolition; 3) re-roofing/flashing & sheet metal; 4) storm system connections; 5) window/door remediation; 60 mechanical/plumbing/electrical; 7) insulation and 8) finishes.