Summary
The work will take place at two separate well facilities for Well SM-10 and Well SM-17. The work will include but is not limited to the demolition of the existing well houses and the construction of a new treatment building at the Well SM-10 and Well SM-17 facilities. The building will house ion exchange (IX) treatment units containing specialized IX resin media for PFAS removal. The project includes all necessary site clearing, soil protection, building construction, installation of the IX treatment systems, and interior and exterior process piping, valves, and fittings to connect with the existing infrastructure at each well facility. It also includes the installation of required instrumentation, associated electrical improvements, HVAC equipment, stormwater management infrastructure, as well as site improvements and restoration.