Summary
Two (2) storm sewer repairs in various locations in the Municipality including, but not limited to: storm sewer line replacement; inlet removal and replacement; bituminous pavement restoration; concrete driveway restoration; pre-repair and post-repair CCTV; utility coordination and protection; traffic control and resident notification; and site access and restoration of all disturbed areas, complete in place. This project involves the removal of an existing storm inlet and its replacement with a new standard 2' x 4' storm inlet, CIPP lining of approx. 190 LF of existing 6" storm main, pre-repair and post-repair CCTV; utility coordination and protection; traffic control and resident notification; and site access and restoration of all disturbed areas, complete in place.