Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of San Antonio is soliciting bids to reconstruct streets, curbs, sidewalks, and driveway approaches to address drainage concerns in the Eastgate Subdivision (Peggy Drive area). The project will regrade the earthen channel between Stutts Drive and Peggy Drive and construct concrete channels that transition to the existing concrete outfall at Tributary A to Rosillo Creek. Offsite improvements include property acquisition and interceptor swales along the Martindale Army Airfield and adjacent residential properties.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Full reconstruction of streets, curbs, sidewalks, and driveway approaches in the Peggy Drive Area Drainage (Eastgate Subdivision) to address drainage concerns, including regrading and creating concrete channels, and property acquisition for interceptor swales.
Posted Date
Dec 15, 2025
Due Date
Jan 23, 2026
Release: Dec 15, 2025
Close: Jan 23, 2026
Full reconstruction of streets, curbs, sidewalks, and driveway approaches in the Peggy Drive Area Drainage (Eastgate Subdivision) to address drainage concerns, including regrading and creating concrete channels, and property acquisition for interceptor swales.
AvailableThe City of San Antonio (Capital Delivery Department) issued an Invitation for Bids (IFB) for the Oak Haven Area Streets and Drainage - Kentwood PH 2 project, funded by the 2022 Bond, to perform street improvements and drainage enhancements in the Oak Haven area. Online bidding is via CivCast (https://www.civcastusa.com/bids); bidding opens December 12, 2025 and closes January 20, 2026 at 2:00 PM CT, with a non-mandatory WebEx pre-bid meeting on December 22, 2025. The procurement is a construction IFB (unit-price contract, estimated construction budget ~$10.96M) — not a grant — and bidders must comply with SBEDA, register with SAePS, and meet prevailing wage requirements.
Posted Date
Dec 12, 2025
Due Date
Jan 20, 2026
Release: Dec 12, 2025
Close: Jan 20, 2026
The City of San Antonio (Capital Delivery Department) issued an Invitation for Bids (IFB) for the Oak Haven Area Streets and Drainage - Kentwood PH 2 project, funded by the 2022 Bond, to perform street improvements and drainage enhancements in the Oak Haven area. Online bidding is via CivCast (https://www.civcastusa.com/bids); bidding opens December 12, 2025 and closes January 20, 2026 at 2:00 PM CT, with a non-mandatory WebEx pre-bid meeting on December 22, 2025. The procurement is a construction IFB (unit-price contract, estimated construction budget ~$10.96M) — not a grant — and bidders must comply with SBEDA, register with SAePS, and meet prevailing wage requirements.
Work includes to install an underground storm drain system and associated roadway reconstruction to include sidewalks, curbs, driveway approaches, and other improvements as applicable and within available funding.
Posted Date
Dec 3, 2025
Due Date
Jan 13, 2026
Release: Dec 3, 2025
Close: Jan 13, 2026
Work includes to install an underground storm drain system and associated roadway reconstruction to include sidewalks, curbs, driveway approaches, and other improvements as applicable and within available funding.
AvailableProcurement of labor, materials, and equipment for the construction of drainage improvements, including 8-inch and 4-inch IPS HDPE force main pipe installation, lift stations, electrical work, grading, excavation, and erosion control.
Posted Date
Dec 30, 2025
Due Date
Feb 5, 2026
Release: Dec 30, 2025
Close: Feb 5, 2026
Procurement of labor, materials, and equipment for the construction of drainage improvements, including 8-inch and 4-inch IPS HDPE force main pipe installation, lift stations, electrical work, grading, excavation, and erosion control.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis