Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 unit tree removal, 4 unit rectangular rapid flashing beacons, 200 LF 2" rigid metallic conduit, 4 unit 18"x36" junction boxes, 2 unit electric meter cabinet, striping, and incidentals.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide street dual pedestrian bridge replacement project.
Posted Date
Jan 15, 2026
Due Date
Feb 5, 2026
Release: Jan 15, 2026
Close: Feb 5, 2026
Provide street dual pedestrian bridge replacement project.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the installation of ductile iron water main pipe ranging from 6" to 10" diameter in size, installation of combined and storm sewer pipe ranging from 8" to 24" diameter in size, public, full, and private lead water service pipe replacements, partial water service replacements (not lead) to accommodate the work, related appurtenances, concrete curb and sidewalk repairs, pavement patching, parkway restoration, private side restoration (full and private lead water service pipe replacements only), large diameter valve replacement, and all materials, labor, equipment, and incidental work.
Posted Date
Jan 15, 2026
Due Date
Feb 17, 2026
Release: Jan 15, 2026
Close: Feb 17, 2026
Project includes the installation of ductile iron water main pipe ranging from 6" to 10" diameter in size, installation of combined and storm sewer pipe ranging from 8" to 24" diameter in size, public, full, and private lead water service pipe replacements, partial water service replacements (not lead) to accommodate the work, related appurtenances, concrete curb and sidewalk repairs, pavement patching, parkway restoration, private side restoration (full and private lead water service pipe replacements only), large diameter valve replacement, and all materials, labor, equipment, and incidental work.
AvailableThe Town of Eagle, Colorado is soliciting bids for streetscape and utility improvements on Capitol Street. The project is expected to include upgrades to pedestrian and streetscape elements along with utility replacements or improvements. Bids are due February 13, 2026 at 12:00 PM MST.
Posted Date
Jan 12, 2026
Due Date
Feb 13, 2026
Release: Jan 12, 2026
Close: Feb 13, 2026
The Town of Eagle, Colorado is soliciting bids for streetscape and utility improvements on Capitol Street. The project is expected to include upgrades to pedestrian and streetscape elements along with utility replacements or improvements. Bids are due February 13, 2026 at 12:00 PM MST.
AvailableProject includes the construction of new on-street bike lanes, 10-foot-wide multi-use sidewalk, and associated pedestrian and bicycle improvements including drainage infrastructure.
Posted Date
Jan 7, 2026
Due Date
Feb 4, 2026
Release: Jan 7, 2026
Close: Feb 4, 2026
Project includes the construction of new on-street bike lanes, 10-foot-wide multi-use sidewalk, and associated pedestrian and bicycle improvements including drainage infrastructure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →