Summary
Roadway restoration work on Dawson Street associated with waterline installation. The project consists of furnishing all labor, materials, equipment and supervision necessary to remove and restore portions of the roadway. Work shall include removing the first 24 F of Dawson Street at its intersection with Ewing Street, excavating approx. 6" of existing material and hauling and disposing of all removed material off-site. In addition, the contractor shall mill approx. 500 F along the waterline trench to a depth of 6" and similarly remove and dispose of all milled material. The contractor shall then furnish and install 3 inches of compacted stone base course followed by 3 inches of bituminous blacktop base course within the trench area and the removed section of Dawson Street. A transverse joint shall be milled across Dawson Street to ensure a smooth tie-in, after which the roadway shall be swept and properly prepared for paving. The project shall be completed by furnishing and installing a 1.5" average depth 19mm binder course and a 1.5" surface course overlay across the repaired pavement and adjacent existing pavement to provide a uniform finished surface.