Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The paving project area consists of 1,080 SF, plus an additional 120 SF including t-cap. Work includes traffic control, saw-cutting, dispose of existing asphalt, temporary mix, and base material (in temporary mix area), compact subgrade, tack edges of existing asphalt/concrete, 8" base paving, 2" grind and overlay paving, install new asphalt within the repair area, base paving shall be 3b3-pg 64-10 and final paving shall be 3c3-pg 64-10.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Del Mar seeks bids from qualified contractors for the construction of pavement reconstruction, traffic control, and traffic striping for the Jimmy Durante Boulevard Pavement Rehabilitation Project.
Posted Date
Dec 23, 2025
Due Date
Jan 28, 2026
Release: Dec 23, 2025
Close: Jan 28, 2026
The City of Del Mar seeks bids from qualified contractors for the construction of pavement reconstruction, traffic control, and traffic striping for the Jimmy Durante Boulevard Pavement Rehabilitation Project.
AvailableAsphalt Rubber Hot Mix (ARHM); Adjust sewer manhole frame and cover to grade; Adjust water valve cover to grade; Cold milling 0.10’ thick of existing pavement; Remove and replace existing pavement; Remove and replace existing curb and gutter; Remove and replace existing concrete spandrel per city STD R-5; Detail A24D, “STOP” and Stop bar; Detail A24D, “DIP AHEAD”.
Posted Date
Nov 25, 2025
Due Date
Jan 6, 2026
Release: Nov 25, 2025
Close: Jan 6, 2026
Asphalt Rubber Hot Mix (ARHM); Adjust sewer manhole frame and cover to grade; Adjust water valve cover to grade; Cold milling 0.10’ thick of existing pavement; Remove and replace existing pavement; Remove and replace existing curb and gutter; Remove and replace existing concrete spandrel per city STD R-5; Detail A24D, “STOP” and Stop bar; Detail A24D, “DIP AHEAD”.
AvailableThe City of Belleair Beach is soliciting bids for the B25-03 8th Street Stormwater Rehabilitation Project to rehabilitate stormwater pipes on 8th Street, including general and heavy construction and storm drain repair/cleaning services. The procurement is an Invitation to Bid (ITB) with electronic bidding enabled and a non-mandatory site inspection option; contractors must obtain verbal permission from property owners before entering private property. The bid package is distributed by DemandStar and the bid opening is scheduled for January 9, 2026 at 2:00 PM Eastern.
Posted Date
Dec 8, 2025
Due Date
Jan 9, 2026
Release: Dec 8, 2025
Close: Jan 9, 2026
The City of Belleair Beach is soliciting bids for the B25-03 8th Street Stormwater Rehabilitation Project to rehabilitate stormwater pipes on 8th Street, including general and heavy construction and storm drain repair/cleaning services. The procurement is an Invitation to Bid (ITB) with electronic bidding enabled and a non-mandatory site inspection option; contractors must obtain verbal permission from property owners before entering private property. The bid package is distributed by DemandStar and the bid opening is scheduled for January 9, 2026 at 2:00 PM Eastern.
Provide pavement rehabilitation.
Posted Date
Nov 17, 2025
Due Date
Feb 6, 2026
Release: Nov 17, 2025
Close: Feb 6, 2026
Provide pavement rehabilitation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis