Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide construction of a new Office ADA compliant ramp.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Vermont Buildings & General Services is soliciting bids to replace the underground fuel storage tank at the Emory A. Hebard State Office Building in Newport, VT, including removal of the existing tank, installation of a new tank, and site restoration such as replacing selected pavers with poured concrete. Work is to be coordinated with the State’s project manager and is expected to occur during the 2026 construction season. The solicitation is a construction RFP (rebid) issued by the State of Vermont and is open through January 21, 2026.
Posted Date
-
Due Date
Jan 21, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 21, 2026
Vermont Buildings & General Services is soliciting bids to replace the underground fuel storage tank at the Emory A. Hebard State Office Building in Newport, VT, including removal of the existing tank, installation of a new tank, and site restoration such as replacing selected pavers with poured concrete. Work is to be coordinated with the State’s project manager and is expected to occur during the 2026 construction season. The solicitation is a construction RFP (rebid) issued by the State of Vermont and is open through January 21, 2026.
AvailableQualified General Contractor to Construct the General Government Office Building - Phase I (Project). The General Government Office Building Phase I is a three (3) story 125,000 square foot (SF) office building.
Posted Date
Aug 22, 2025
Due Date
Jan 23, 2026
Release: Aug 22, 2025
Close: Jan 23, 2026
Qualified General Contractor to Construct the General Government Office Building - Phase I (Project). The General Government Office Building Phase I is a three (3) story 125,000 square foot (SF) office building.
AvailableThe New Hampshire Fish and Game Department is seeking firms for concrete infrastructure construction and site work to replace an existing concrete plank boat ramp and install a new concrete plank ramp with an associated protective concrete plank surface at Crystal Lake in Enfield, NH.
Posted Date
-
Due Date
Jan 20, 2026
Close: Jan 20, 2026
The New Hampshire Fish and Game Department is seeking firms for concrete infrastructure construction and site work to replace an existing concrete plank boat ramp and install a new concrete plank ramp with an associated protective concrete plank surface at Crystal Lake in Enfield, NH.
AvailableRebid of bid package 10a: structural steel supply & bid package 22a: plumbing and site utilities. Project includes the Structural Steel Supply and/or Erection and the Plumbing / Site Utilities for a new 36,000sf preengineered metal building and the renovation of 11,400sf of existing facilities.
Posted Date
Nov 12, 2025
Due Date
Jan 15, 2026
Release: Nov 12, 2025
Close: Jan 15, 2026
Rebid of bid package 10a: structural steel supply & bid package 22a: plumbing and site utilities. Project includes the Structural Steel Supply and/or Erection and the Plumbing / Site Utilities for a new 36,000sf preengineered metal building and the renovation of 11,400sf of existing facilities.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →