Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of 3,800 SF of concrete sidewalk, ADA ramps, crosswalks, and all necessary appurtenances and restoration for said construction including add alternatives for additional lengths of sidewalk.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Sidewalk improvements including but not limited to: site preparation; earthwork; roadway construction; sidewalk and guardrail construction; erosion control & pollution abatement; maintenance of traffic.
Posted Date
Dec 18, 2025
Due Date
Jan 15, 2026
Release: Dec 18, 2025
Close: Jan 15, 2026
Sidewalk improvements including but not limited to: site preparation; earthwork; roadway construction; sidewalk and guardrail construction; erosion control & pollution abatement; maintenance of traffic.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This includes sidewalk repair and construction, drainage, utility, lighting, sodding, traffic signing and pavement markings, and all the associated improvements.
Posted Date
Dec 12, 2025
Due Date
Jan 22, 2026
Release: Dec 12, 2025
Close: Jan 22, 2026
This includes sidewalk repair and construction, drainage, utility, lighting, sodding, traffic signing and pavement markings, and all the associated improvements.
AvailableThis RFP is for the installation of Brightleaf Boulevard and Narrows Road Sidewalk Improvements-Phase 2.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
This RFP is for the installation of Brightleaf Boulevard and Narrows Road Sidewalk Improvements-Phase 2.
AvailableWork consists of sidewalk improvements. Includes, 1,703 SY of type "A" sidewalk; 432 SY of type "B" sidewalk; 228 TON of compacted crushed stone; 177 SY of concrete street crossing; 152 SF of construction signs; 131 SF of tactile warning surface; 100 LF of 24" white stop bar; 82 SY of modot type 1-A curb ramp; 51 SF of signage; 46 LF of 18" rcp; 33 CY of class 3 excavation; 27 SY of modot type 1-B curb ramp; 12 LF of curb & gutter; 10 LF of 24" rcp; 8 CY of rock lining; removal of improvements.
Posted Date
Mar 30, 2025
Due Date
Jan 27, 2026
Release: Mar 30, 2025
Close: Jan 27, 2026
Work consists of sidewalk improvements. Includes, 1,703 SY of type "A" sidewalk; 432 SY of type "B" sidewalk; 228 TON of compacted crushed stone; 177 SY of concrete street crossing; 152 SF of construction signs; 131 SF of tactile warning surface; 100 LF of 24" white stop bar; 82 SY of modot type 1-A curb ramp; 51 SF of signage; 46 LF of 18" rcp; 33 CY of class 3 excavation; 27 SY of modot type 1-B curb ramp; 12 LF of curb & gutter; 10 LF of 24" rcp; 8 CY of rock lining; removal of improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →