Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide electrical work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Tennessee Department of Transportation (TDOT) is soliciting bids to perform roadway excavation, compaction, asphalt removal and preparation, subgrade and base preparation, grading, and site restoration to support construction of two left-turn lanes in Cannon County. The work includes providing all labor, equipment, and materials and coordinating with TDOT’s project representative and traffic control, and must comply with TDOT road and bridge construction specifications. The project must be completed and receive final TDOT approval on or before March 1, 2026.
Posted Date
Dec 22, 2025
Due Date
Jan 15, 2026
Release: Dec 22, 2025
Close: Jan 15, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Tennessee Department of Transportation (TDOT) is soliciting bids to perform roadway excavation, compaction, asphalt removal and preparation, subgrade and base preparation, grading, and site restoration to support construction of two left-turn lanes in Cannon County. The work includes providing all labor, equipment, and materials and coordinating with TDOT’s project representative and traffic control, and must comply with TDOT road and bridge construction specifications. The project must be completed and receive final TDOT approval on or before March 1, 2026.
AvailableThe project will include delegated design and construction of buildings and canopies; building demolition, construction of new paved yards areas and roads; railroad track crossings; storm drainage distribution and ditches; water, sewer, natural gas and electrical distributions and security technologies; fencing, barrier, guardrail, striping and signage work. Majority of construction will take place outside Garden City Terminal’s secure perimeter.
Posted Date
Nov 7, 2025
Due Date
Jan 6, 2026
Release: Nov 7, 2025
Close: Jan 6, 2026
The project will include delegated design and construction of buildings and canopies; building demolition, construction of new paved yards areas and roads; railroad track crossings; storm drainage distribution and ditches; water, sewer, natural gas and electrical distributions and security technologies; fencing, barrier, guardrail, striping and signage work. Majority of construction will take place outside Garden City Terminal’s secure perimeter.
AvailablePerimeter fencing for wastewater department.
Posted Date
Oct 26, 2025
Due Date
Dec 31, 2025
Release: Oct 26, 2025
Close: Dec 31, 2025
Perimeter fencing for wastewater department.
AvailableThe Project includes the reconfiguration of existing gate counters on Concourse A. The new gate counters will accommodate both Ease and proprietary airline equipment requiring electrical and telecommunication modifications. The project will also include hold room modifications at the west end of the concourse, a new tenant space between A11 and A12, relocation of the FIDS at the south end of the Concourse A Phase 1 connector, and infrastructure for experiential elements including a projector light wall.
Posted Date
Dec 1, 2025
Due Date
Jan 8, 2026
Release: Dec 1, 2025
Close: Jan 8, 2026
The Project includes the reconfiguration of existing gate counters on Concourse A. The new gate counters will accommodate both Ease and proprietary airline equipment requiring electrical and telecommunication modifications. The project will also include hold room modifications at the west end of the concourse, a new tenant space between A11 and A12, relocation of the FIDS at the south end of the Concourse A Phase 1 connector, and infrastructure for experiential elements including a projector light wall.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →