Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for cleaning, repairs, resurfacing, and line painting of sport courts in public parks and rehabilitation of multiple parking lots.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Cosumnes Community Services District is soliciting sealed bids for a Parking Lot Rehabilitation project to clean, repair, seal/coat, crack-fill, and re-stripe multiple parking lots and concrete areas at parks and fire stations in Elk Grove and Galt, CA. The contract requires licensed California contractors (General A or C-32/C-12) registered with the Department of Industrial Relations and includes prevailing wage and bid security requirements. Bids are due at 10:00 a.m. local time on January 7, 2026, with work expected to commence after award (period of performance beginning upon Notice to Proceed on February 4, 2026).
Posted Date
Dec 10, 2025
Due Date
Jan 7, 2026
Release: Dec 10, 2025
Close: Jan 7, 2026
Cosumnes Community Services District is soliciting sealed bids for a Parking Lot Rehabilitation project to clean, repair, seal/coat, crack-fill, and re-stripe multiple parking lots and concrete areas at parks and fire stations in Elk Grove and Galt, CA. The contract requires licensed California contractors (General A or C-32/C-12) registered with the Department of Industrial Relations and includes prevailing wage and bid security requirements. Bids are due at 10:00 a.m. local time on January 7, 2026, with work expected to commence after award (period of performance beginning upon Notice to Proceed on February 4, 2026).
Premium
Access the largest public sector contact database
Contractor shall commence the following scope for Lot 1, Lot 3, Lot 5. Mill 1 ½ inches so not to change the finished elevation when resurfaced; Apply 1 ½" of surface material after the mill; ADA Meter poles will need to stay however lowered to 48 inches in all lots/if removed, they will need to be replaced (contact parking prior to removal of any meter heads); ADA markings must be replaced; Straighten all signage poles in lots ; Re-stripe all traffic control ground paint markings, including all parking stalls; All striping back to previous detail; If bumper blocks are to be removed then reset after the placement of surface; If signage is removed all signage needs to be reinstalled; Replacement of bumper blocks if broken during removal; Clear all unwanted vegetation if present; Provide barricade for complete lot closure; Removal of all capped or not capped meter poles (base treatment as needed to fill the voids). See outside link.
Posted Date
Nov 23, 2025
Due Date
Dec 15, 2025
Release: Nov 23, 2025
Close: Dec 15, 2025
Contractor shall commence the following scope for Lot 1, Lot 3, Lot 5. Mill 1 ½ inches so not to change the finished elevation when resurfaced; Apply 1 ½" of surface material after the mill; ADA Meter poles will need to stay however lowered to 48 inches in all lots/if removed, they will need to be replaced (contact parking prior to removal of any meter heads); ADA markings must be replaced; Straighten all signage poles in lots ; Re-stripe all traffic control ground paint markings, including all parking stalls; All striping back to previous detail; If bumper blocks are to be removed then reset after the placement of surface; If signage is removed all signage needs to be reinstalled; Replacement of bumper blocks if broken during removal; Clear all unwanted vegetation if present; Provide barricade for complete lot closure; Removal of all capped or not capped meter poles (base treatment as needed to fill the voids). See outside link.
Availablework is only for Parking Lot “A” which is approx 8.66-acres and is currently a mix of gravel, chip seal and asphalt.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
work is only for Parking Lot “A” which is approx 8.66-acres and is currently a mix of gravel, chip seal and asphalt.
AvailableExpand B330 staff parking lot. Site preparation and grading Gravel installation Installation of parking blocks. Construct an approximately 93,200 SF gravel parking lot with approximately 320 parking spaces.
Posted Date
Oct 29, 2025
Due Date
Jan 22, 2026
Release: Oct 29, 2025
Close: Jan 22, 2026
Expand B330 staff parking lot. Site preparation and grading Gravel installation Installation of parking blocks. Construct an approximately 93,200 SF gravel parking lot with approximately 320 parking spaces.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis