Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide outdoor parking lot or walkway retrofit kits, LED upgrade.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 1 LS of preserve and reuse existing branch circuits, conduits, and wiring as-is unless directed otherwise in writing by the engineer. Furnish and install all required wiring as shown on the plans and specifications only as directed; 1 LS of remove existing lighting fixtures only. Do not disturb existing branch circuits, conduits, or junction boxes unless otherwise noted; 1 LS of furnish and install new led lighting fixtures (type sp, sw, sw-s) on existing poles using verified tenon-mounted slipfitters per manufacturer's recommendations; etc, see attached file.
Posted Date
Nov 21, 2025
Due Date
Jan 28, 2026
Release: Nov 21, 2025
Close:
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS of preserve and reuse existing branch circuits, conduits, and wiring as-is unless directed otherwise in writing by the engineer. Furnish and install all required wiring as shown on the plans and specifications only as directed; 1 LS of remove existing lighting fixtures only. Do not disturb existing branch circuits, conduits, or junction boxes unless otherwise noted; 1 LS of furnish and install new led lighting fixtures (type sp, sw, sw-s) on existing poles using verified tenon-mounted slipfitters per manufacturer's recommendations; etc, see attached file.
AvailableRelease: Jan 23, 2026
Close: Feb 23, 2026
Provide parking lot paving.
AvailableParking lot sweeping services. Parking lot sweeping semi. 2 ea. See attached file.
Posted Date
Jan 13, 2026
Due Date
Feb 11, 2026
Release: Jan 13, 2026
Close: Feb 11, 2026
Parking lot sweeping services. Parking lot sweeping semi. 2 ea. See attached file.
AvailableSeeking for street & parking lot cleaning services for the city of wastewater department.
Posted Date
Jan 18, 2026
Due Date
Feb 3, 2026
Release: Jan 18, 2026
Close: Feb 3, 2026
Seeking for street & parking lot cleaning services for the city of wastewater department.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →