Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide outdoor parking lot or walkway retrofit kits, LED upgrade.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 1 LS of preserve and reuse existing branch circuits, conduits, and wiring as-is unless directed otherwise in writing by the engineer. Furnish and install all required wiring as shown on the plans and specifications only as directed; 1 LS of remove existing lighting fixtures only. Do not disturb existing branch circuits, conduits, or junction boxes unless otherwise noted; 1 LS of furnish and install new led lighting fixtures (type sp, sw, sw-s) on existing poles using verified tenon-mounted slipfitters per manufacturer's recommendations; etc, see attached file.
Posted Date
Nov 21, 2025
Due Date
Jan 28, 2026
Release: Nov 21, 2025
Close: Jan 28, 2026
Premium
Access the largest public sector contact database
Work includes 1 LS of preserve and reuse existing branch circuits, conduits, and wiring as-is unless directed otherwise in writing by the engineer. Furnish and install all required wiring as shown on the plans and specifications only as directed; 1 LS of remove existing lighting fixtures only. Do not disturb existing branch circuits, conduits, or junction boxes unless otherwise noted; 1 LS of furnish and install new led lighting fixtures (type sp, sw, sw-s) on existing poles using verified tenon-mounted slipfitters per manufacturer's recommendations; etc, see attached file.
Work includes 1 LS of preserve and reuse existing branch circuits, conduits, and wiring as-is unless directed otherwise in writing by the engineer. Furnish and install all required wiring as shown on the plans and specifications only as directed; 1 LS of remove existing lighting fixtures only. Do not disturb existing branch circuits, conduits, or junction boxes unless otherwise noted; 1 LS of furnish and install new led lighting fixtures (type sp, sw, sw-s) on existing poles using verified tenon-mounted slipfitters per manufacturer's recommendations; etc, see attached file.
Posted Date
Nov 21, 2025
Due Date
Jan 28, 2026
Release: Nov 21, 2025
Close: Jan 28, 2026
Work includes 1 LS of preserve and reuse existing branch circuits, conduits, and wiring as-is unless directed otherwise in writing by the engineer. Furnish and install all required wiring as shown on the plans and specifications only as directed; 1 LS of remove existing lighting fixtures only. Do not disturb existing branch circuits, conduits, or junction boxes unless otherwise noted; 1 LS of furnish and install new led lighting fixtures (type sp, sw, sw-s) on existing poles using verified tenon-mounted slipfitters per manufacturer's recommendations; etc, see attached file.
AvailableThe Metropolitan Atlanta Rapid Transit Authority (MARTA) seeks quotes to perform sealcoating, crack sealing, pothole repairs, vegetation removal, and restriping of existing asphalt at designated overflow and station parking lots. The RFQ is a fixed-price procurement requiring the quoter to provide all equipment, materials, labor, proof of insurance/bonding and to demonstrate relevant experience; the contract period begins upon Notice to Proceed and runs for two years. Questions are due 2025-12-15 and quotes are due by 2025-12-19; the solicitation is not a grant and is currently open (open date 2025-12-08).
Posted Date
-
Due Date
Dec 19, 2025
Close: Dec 19, 2025
The Metropolitan Atlanta Rapid Transit Authority (MARTA) seeks quotes to perform sealcoating, crack sealing, pothole repairs, vegetation removal, and restriping of existing asphalt at designated overflow and station parking lots. The RFQ is a fixed-price procurement requiring the quoter to provide all equipment, materials, labor, proof of insurance/bonding and to demonstrate relevant experience; the contract period begins upon Notice to Proceed and runs for two years. Questions are due 2025-12-15 and quotes are due by 2025-12-19; the solicitation is not a grant and is currently open (open date 2025-12-08).
AvailableWork includes sealcoating, crack sealing, pothole repairs, vegetation removal, and restriping of existing asphalt at designated overflow and station parking lots.
Posted Date
Dec 8, 2025
Due Date
Dec 19, 2025
Release: Dec 8, 2025
Close: Dec 19, 2025
Work includes sealcoating, crack sealing, pothole repairs, vegetation removal, and restriping of existing asphalt at designated overflow and station parking lots.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis