Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This is a Brooks Act A–E presolicitation issued by the U.S. Army Corps of Engineers (USACE) San Francisco District seeking architect-engineer (A-E) qualifications for design services for the Pajaro River Reaches 2 and 3 levee and floodwall, including support during solicitation and engineering during construction. The procurement is NAICS 541330, set aside for small business, and the government intends to award one firm-fixed-price contract. Questions are to be submitted in writing (contact provided) by 07 January 2026 and the response/closing date for the notice is 21 January 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Levee enlargement along the NOV-11 levee reach. The New Orleans to Venice NOV-11 levee reach is approx. 5.2 miles long. This project on the West Bank MRL will involve raising the levee to the authorized design grade with earthen fill. The current levee crown elevation ranges from 10 feet to 15 feet, NAVD88 (2009.55). The proposed plan will raise the entire reach to the 2-Percent (50-year) Level of Risk Reduction (LORR) crown elevation ranging from 17.21 feet to 17.71 feet, NAVD88 (2009.55). Stabilization measures required include the installation of earthen landside stability berms or ground improvement measures consisting of deep material mixing. Additional construction activities required may include the placement of riprap on the west bank of the River, demolition & replacement of local asphalt roadways, demolition & replacement of concrete slope paving, & installation of grouted riprap. The work performed may include new work, reconstruction, rehabilitation, and repairs. Specialty trade contractors are included in this industry if they are engaged in activities primarily related to heavy and civil engineering construction projects (excluding highway, street, bridge, distribution line, oil and gas structure, and utilities building and structure construction). Construction projects involving water resources (e.g., dredging and land drainage), development of marine facilities, and projects involving open space improvement (e.g., parks and trails) are included in this industry.
Posted Date
Dec 23, 2025
Due Date
Jan 23, 2026
Release: Dec 23, 2025
Close: Jan 23, 2026
Levee enlargement along the NOV-11 levee reach. The New Orleans to Venice NOV-11 levee reach is approx. 5.2 miles long. This project on the West Bank MRL will involve raising the levee to the authorized design grade with earthen fill. The current levee crown elevation ranges from 10 feet to 15 feet, NAVD88 (2009.55). The proposed plan will raise the entire reach to the 2-Percent (50-year) Level of Risk Reduction (LORR) crown elevation ranging from 17.21 feet to 17.71 feet, NAVD88 (2009.55). Stabilization measures required include the installation of earthen landside stability berms or ground improvement measures consisting of deep material mixing. Additional construction activities required may include the placement of riprap on the west bank of the River, demolition & replacement of local asphalt roadways, demolition & replacement of concrete slope paving, & installation of grouted riprap. The work performed may include new work, reconstruction, rehabilitation, and repairs. Specialty trade contractors are included in this industry if they are engaged in activities primarily related to heavy and civil engineering construction projects (excluding highway, street, bridge, distribution line, oil and gas structure, and utilities building and structure construction). Construction projects involving water resources (e.g., dredging and land drainage), development of marine facilities, and projects involving open space improvement (e.g., parks and trails) are included in this industry.
AvailableThe California Department of Pesticide Regulation (CDPR) issued Invitation for Bid No. 25-C0062 titled "Electrical Trench, Pajaro Middle School" to draw electricity from an existing panel and install approximately 60 feet of electrical cable and conduit to an Air Monitoring Network fenced area at Pajaro Middle School in Watsonville, CA. Work includes trenching ~60–65 feet, installing conduit and a commercial grade 2-plug GFCI outlet mounted on a 4x4 post, and restoring the site; bidders must hold a C-10 Electrical Contractor license, be registered with the Department of Industrial Relations, and comply with prevailing wages. A mandatory pre-bid site inspection is scheduled for Dec 19, 2025 (attendance required), questions are due Dec 26, 2025, and bids are due Jan 19, 2026; period of performance is estimated Feb 3, 2026 to Jun 30, 2026.
Posted Date
Dec 9, 2025
Due Date
Jan 19, 2026
Release: Dec 9, 2025
Close: Jan 19, 2026
Work includes invasive species management, reforestation, grassland restoration, revegetation with native plant species, and related restoration activities as outlined in the little menomonee river parkway sections 2, 3, and 6 habitat restoration.
Posted Date
-
Due Date
Jan 19, 2026
Close: Jan 19, 2026
Work includes invasive species management, reforestation, grassland restoration, revegetation with native plant species, and related restoration activities as outlined in the little menomonee river parkway sections 2, 3, and 6 habitat restoration.
AvailableThe California Department of Pesticide Regulation (CDPR) issued IFB No. 25-C0061 for purchase and installation of approximately 264 square feet of 8-foot-high galvanized chain link fencing (including a standard gate and cemented support posts) at Pajaro Middle School in Watsonville, CA. A mandatory pre-bid site inspection is scheduled for Friday, December 19, 2025 at 11:00 a.m. PST and questions must be submitted to the CDPR contact by December 26, 2025. Bids are due January 19, 2026; the contract period is expected to begin February 3, 2026 and end June 30, 2026.
Posted Date
Dec 9, 2025
Due Date
Jan 19, 2026
Release: Dec 9, 2025
Close: Jan 19, 2026
The California Department of Pesticide Regulation (CDPR) issued IFB No. 25-C0061 for purchase and installation of approximately 264 square feet of 8-foot-high galvanized chain link fencing (including a standard gate and cemented support posts) at Pajaro Middle School in Watsonville, CA. A mandatory pre-bid site inspection is scheduled for Friday, December 19, 2025 at 11:00 a.m. PST and questions must be submitted to the CDPR contact by December 26, 2025. Bids are due January 19, 2026; the contract period is expected to begin February 3, 2026 and end June 30, 2026.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The California Department of Pesticide Regulation (CDPR) issued Invitation for Bid No. 25-C0062 titled "Electrical Trench, Pajaro Middle School" to draw electricity from an existing panel and install approximately 60 feet of electrical cable and conduit to an Air Monitoring Network fenced area at Pajaro Middle School in Watsonville, CA. Work includes trenching ~60–65 feet, installing conduit and a commercial grade 2-plug GFCI outlet mounted on a 4x4 post, and restoring the site; bidders must hold a C-10 Electrical Contractor license, be registered with the Department of Industrial Relations, and comply with prevailing wages. A mandatory pre-bid site inspection is scheduled for Dec 19, 2025 (attendance required), questions are due Dec 26, 2025, and bids are due Jan 19, 2026; period of performance is estimated Feb 3, 2026 to Jun 30, 2026.
Available