Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The USDA Forest Service (Intermountain Operations Center) issued a presolicitation for the Pactola Loop B Campground Reconstruction Project to reconstruct and upgrade campground facilities adjacent to Pactola Reservoir in Black Hills National Forest, Pennington County, South Dakota. Work includes road widening, adding parking and trailhead, increasing camping spurs, upgrading host site utilities, replacing a pumphouse with a precast treatment building, replacing distribution piping, installing hydrants, and optional sewage vault replacement; period of performance is Mar 1, 2026 – May 20, 2027. Contractors were instructed to submit a Capability Statement only by the due date; the presolicitation was posted Dec 19, 2025 with a response deadline of Jan 12, 2026 at 11:00 a.m. EST.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The USDA Forest Service issued a presolicitation for reconstruction of Loop B at Pactola Reservoir Campground in the Black Hills National Forest, South Dakota, covering road modifications, expansion of camping spurs, host site relocation, water system upgrades, and infrastructure improvements to support modern RVs. This is a presolicitation requesting a Capability Statement only (Statement of Capability) due by January 12, 2026 at 09:00 AM Mountain Time; full bid documents (SOW, drawings, plans) will be provided in the forthcoming formal solicitation. The contracting office contacts are Janice King and Lucas Dahlman (emails listed on the official posting), and the opportunity is listed as a presolicitation/single contract opportunity (Notice ID 1157967) with NAICS 237310 and PSC Z1LB.
Posted Date
Dec 19, 2025
Due Date
Jan 12, 2026
Release: Dec 19, 2025
Close: Jan 12, 2026
The USDA Forest Service issued a presolicitation for reconstruction of Loop B at Pactola Reservoir Campground in the Black Hills National Forest, South Dakota, covering road modifications, expansion of camping spurs, host site relocation, water system upgrades, and infrastructure improvements to support modern RVs. This is a presolicitation requesting a Capability Statement only (Statement of Capability) due by January 12, 2026 at 09:00 AM Mountain Time; full bid documents (SOW, drawings, plans) will be provided in the forthcoming formal solicitation. The contracting office contacts are Janice King and Lucas Dahlman (emails listed on the official posting), and the opportunity is listed as a presolicitation/single contract opportunity (Notice ID 1157967) with NAICS 237310 and PSC Z1LB.
AvailableThe road will be modified with curve widening and shaping for drainage and new surfacing. Generally, the road width will be 16' for one-way traffic and 24' for two-way traffic. A new 20 parking stall trailhead will be constructed. The existing trail trailhead will be repurposed as overflow and boat trailer parking. Loop b currently has 20 spurs that are primitive and poorly defined. The campground will be improved to have a total of 36 camping spurs as base items. There is currently one host site, with power, water, and wastewater vault, located near the center of the campground. See attached file.
Posted Date
Dec 19, 2025
Due Date
Jan 12, 2026
Release: Dec 19, 2025
Close: Jan 12, 2026
The road will be modified with curve widening and shaping for drainage and new surfacing. Generally, the road width will be 16' for one-way traffic and 24' for two-way traffic. A new 20 parking stall trailhead will be constructed. The existing trail trailhead will be repurposed as overflow and boat trailer parking. Loop b currently has 20 spurs that are primitive and poorly defined. The campground will be improved to have a total of 36 camping spurs as base items. There is currently one host site, with power, water, and wastewater vault, located near the center of the campground. See attached file.
This is a presolicitation for the Veterans Point Trail Rehabilitation Project to rehabilitate an existing asphalt trail and associated structures at Veterans Point in Black Hills National Forest (Pennington County, South Dakota). Work includes crack filling and sealing, reconstruction of select trail sections, stabilization of eroding areas, asphalt seal coating, replacing timber retaining walls with segmental concrete block walls, constructing gabion baskets, repairing/removing pipe railings, and removal of certain amenities; an optional bid item covers work on a lakeshore loop. Period of performance is March 15, 2026 May 20, 2027, and the government requests submission of a Capability Statement by the response deadline.
Posted Date
Dec 19, 2025
Due Date
Jan 14, 2026
Release: Dec 19, 2025
Close: Jan 14, 2026
The Defense Logistics Agency Land and Maritime issued an RFQ (SPE7LX26U2821) requesting quotes for 9,508 units of CLAMP, LOOP (NSN 5340015392440). The procurement is a Total Small Business set-aside for an Automated Indefinite Delivery Contract with a one-year term or until aggregate orders reach $350,000; minimum guaranteed quantity 1,426 units and estimated 11 orders/year with delivery within 73 days of order. All responsible sources are eligible to submit electronic quotes by January 21, 2026; no specifications or hard copy drawings were provided on the solicitation pages.
Posted Date
Jan 6, 2026
Due Date
Jan 21, 2026
Release: Jan 6, 2026
Close: Jan 21, 2026
The Defense Logistics Agency Land and Maritime issued an RFQ (SPE7LX26U2821) requesting quotes for 9,508 units of CLAMP, LOOP (NSN 5340015392440). The procurement is a Total Small Business set-aside for an Automated Indefinite Delivery Contract with a one-year term or until aggregate orders reach $350,000; minimum guaranteed quantity 1,426 units and estimated 11 orders/year with delivery within 73 days of order. All responsible sources are eligible to submit electronic quotes by January 21, 2026; no specifications or hard copy drawings were provided on the solicitation pages.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This is a presolicitation for the Veterans Point Trail Rehabilitation Project to rehabilitate an existing asphalt trail and associated structures at Veterans Point in Black Hills National Forest (Pennington County, South Dakota). Work includes crack filling and sealing, reconstruction of select trail sections, stabilization of eroding areas, asphalt seal coating, replacing timber retaining walls with segmental concrete block walls, constructing gabion baskets, repairing/removing pipe railings, and removal of certain amenities; an optional bid item covers work on a lakeshore loop. Period of performance is March 15, 2026 May 20, 2027, and the government requests submission of a Capability Statement by the response deadline.