Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Naval Facilities Engineering Command (NAVFAC) issued Solicitation N6247026R0006 for P919 Bulk Tank Fuel Farm Improvements and Pipeline Phase 1 at Naval Station Rota, Spain, requesting construction of tank farm and pipeline improvements. The solicitation includes site visit instructions, multiple attachments (including the primary solicitation PDF and technical volumes), and was amended on Dec 1, 2025 to respond to PPIs and provide revised documents. Proposals are due Jan 14, 2026 at 2:00 PM EST.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Naval Facilities Engineering Command is soliciting proposals for construction of the FX74 Strategic Airlift Hangar at Naval Station Rota, Spain under NAICS 236210. The solicitation (N62470-26-R-0008) was posted 2025-12-19 and proposals are due 2026-02-26; a site visit is scheduled and requests to participate must be submitted by 2026-01-08. The solicitation is not a grant and is not set aside; the full solicitation package appears to be hosted on the DoD PIEE portal (vendor access required) for attachments and submission instructions.
Posted Date
Dec 19, 2025
Due Date
Feb 26, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 26, 2026
The Naval Facilities Engineering Command is soliciting proposals for construction of the FX74 Strategic Airlift Hangar at Naval Station Rota, Spain under NAICS 236210. The solicitation (N62470-26-R-0008) was posted 2025-12-19 and proposals are due 2026-02-26; a site visit is scheduled and requests to participate must be submitted by 2026-01-08. The solicitation is not a grant and is not set aside; the full solicitation package appears to be hosted on the DoD PIEE portal (vendor access required) for attachments and submission instructions.
AvailableThe Department of the Navy (NAVFAC) issued Solicitation N6247026R0008 for construction of the FX74 Strategic Airlift Hangar at Naval Station Rota, Spain. The work includes construction of a new industrial/aircraft hangar and associated site work; bidders must demonstrate prior experience with aircraft hangars and airfield paving and provide required performance/payment bonds. Site visit is scheduled for 9 February 2026 (site-visit submissions due 8 January 2026); proposals are due 2026-02-26 13:00 EST.
Posted Date
Dec 19, 2025
Due Date
Feb 26, 2026
Release: Dec 19, 2025
Close: Feb 26, 2026
The Department of the Navy (NAVFAC) issued Solicitation N6247026R0008 for construction of the FX74 Strategic Airlift Hangar at Naval Station Rota, Spain. The work includes construction of a new industrial/aircraft hangar and associated site work; bidders must demonstrate prior experience with aircraft hangars and airfield paving and provide required performance/payment bonds. Site visit is scheduled for 9 February 2026 (site-visit submissions due 8 January 2026); proposals are due 2026-02-26 13:00 EST.
AvailableWork includes construction of lift station improvements.
Posted Date
Dec 16, 2025
Due Date
Jan 19, 2026
Release: Dec 16, 2025
Close: Jan 19, 2026
Work includes construction of lift station improvements.
AvailableWork includes improvements to the town's existing wastewater treatment plant (wwtp) and collection system, the wwtp work includes but is not limited to conversion of the existing sludge digester to a new sequential batch reactor (sbr) with new diffused aeration equipment, new sbr blowers with vfd's and dissolved oxygen (do) control, backup sbr control system, structural improvements to the existing concrete tanks, conversion of the existing chlorine contact tank to a new uv disinfection tank, new effluent pump station with new force main and outfall structure, the collection system work includes but is not limited to replacing the existing lift station with a new submersible lift station, wet well, valve pit, electrical, controls, cloud-based monitoring system, and replacement of the existing force main.
Posted Date
Dec 10, 2025
Due Date
Feb 17, 2026
Release: Dec 10, 2025
Close: Feb 17, 2026
Work includes improvements to the town's existing wastewater treatment plant (wwtp) and collection system, the wwtp work includes but is not limited to conversion of the existing sludge digester to a new sequential batch reactor (sbr) with new diffused aeration equipment, new sbr blowers with vfd's and dissolved oxygen (do) control, backup sbr control system, structural improvements to the existing concrete tanks, conversion of the existing chlorine contact tank to a new uv disinfection tank, new effluent pump station with new force main and outfall structure, the collection system work includes but is not limited to replacing the existing lift station with a new submersible lift station, wet well, valve pit, electrical, controls, cloud-based monitoring system, and replacement of the existing force main.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →