Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bid Package #1 Work includes Demolition, Building Concrete, Masonry, Miscellaneous Metal & Railings, Door Assemblies - Supply, Door Door Assemblies - Install, Glass & Glazing, Overhead Doors, Gypsum Assemblies & Ceiling Systems, Painting Wallcoverings, Specialties, Signage, Food Service Equipment, Sports Equipment, Special Construction (PEMB), Plumbing, HVAC, Electrical, Earthwork, Site Concrete, Asphalt Paving, Fencing, Landscaping & Irrigation, Site Site Utilities.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Bid Phase #1 Bid Package 4A - Masonry; Bid Package 6A - Rough Framing Labor; Bid Package 6B - Architectural Millwork; Bid Package 7A - Roofing Systems; Bid Package 8A - Doors, Frames, and Hardware Supply; Bid Package 8D - Doors, Hardware, and Specialties install; Bid Package 9A - Drywall and Insulation; Bid Package 9B - Flooring; Bid Package 9C - Painting; Bid Package 12A - Window Coverings; Bid Package 21A - Fire Suppression; Bid Package 22A - Plumbing; Bid Package 23A - HVAC; Bid Package 26A - Electrical.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Close: Dec 18, 2025
Premium
Access the largest public sector contact database
Bid Phase #1 Bid Package 4A - Masonry; Bid Package 6A - Rough Framing Labor; Bid Package 6B - Architectural Millwork; Bid Package 7A - Roofing Systems; Bid Package 8A - Doors, Frames, and Hardware Supply; Bid Package 8D - Doors, Hardware, and Specialties install; Bid Package 9A - Drywall and Insulation; Bid Package 9B - Flooring; Bid Package 9C - Painting; Bid Package 12A - Window Coverings; Bid Package 21A - Fire Suppression; Bid Package 22A - Plumbing; Bid Package 23A - HVAC; Bid Package 26A - Electrical.
Project consists stadium concessions - bid release no. 1, bid package no. 1. 1 - building structures.
Posted Date
Dec 8, 2025
Due Date
Dec 18, 2025
Release: Dec 8, 2025
Close: Dec 18, 2025
Project consists stadium concessions - bid release no. 1, bid package no. 1. 1 - building structures.
AvailableWork includes : 560 LF temporary slope drains; 1 EA modifaction to temporary sediment basin; 9 EA culvert inlet protection; 1,700 LF silt sock (sediment retention roll); 500 CY muck excavation; 120 LF 15" class v, rcp; 148 LF 18" class v, rcp; see outside link.
Posted Date
Dec 2, 2025
Due Date
Jan 7, 2026
Release: Dec 2, 2025
Close: Jan 7, 2026
Work includes : 560 LF temporary slope drains; 1 EA modifaction to temporary sediment basin; 9 EA culvert inlet protection; 1,700 LF silt sock (sediment retention roll); 500 CY muck excavation; 120 LF 15" class v, rcp; 148 LF 18" class v, rcp; see outside link.
AvailableProject consists of east wing renovation - bid package wp-1.
Posted Date
Dec 5, 2025
Due Date
Dec 18, 2025
Release: Dec 5, 2025
Close: Dec 18, 2025
Project consists of east wing renovation - bid package wp-1.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis