Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of approx. 1 LS Mobilization/Demobilization; 1 LS Site Preparation and Control; 1 LS Demo/Abandonment of Existing Pipe and Headwall; 1 LS Installation of New Pipe, Manhole and Headwall.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide Simcart and Headwall Accessories.
Posted Date
Dec 9, 2025
Due Date
Dec 17, 2025
Release: Dec 9, 2025
Close: Dec 17, 2025
Provide Simcart and Headwall Accessories.
AvailablePremium
Access the largest public sector contact database
2023 Swift Creek Sanitary Sewer Contract No. 8 - Sanitary Sewer Outfall Replacement.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
2023 Swift Creek Sanitary Sewer Contract No. 8 - Sanitary Sewer Outfall Replacement.
AvailableProject scope involves removing the existing switchgear, supplying and installing a new switchgear system, and ensuring compatibility with existing transfer control equipment. This will improve reliability of the electrical infrastructure. Key requirements include compatibility with the upgraded echowater distributed control system (dcs) transfer controls and addressing issues related to maintaining power to critical equipment at the outfall.
Posted Date
Nov 10, 2025
Due Date
Jan 8, 2026
Release: Nov 10, 2025
Close: Jan 8, 2026
Project scope involves removing the existing switchgear, supplying and installing a new switchgear system, and ensuring compatibility with existing transfer control equipment. This will improve reliability of the electrical infrastructure. Key requirements include compatibility with the upgraded echowater distributed control system (dcs) transfer controls and addressing issues related to maintaining power to critical equipment at the outfall.
AvailableSacSewer seeks contractors to remove and replace the X09 Outfall electrical switchgear at the EchoWater Resource Recovery Facility: supply, install, and integrate new switchgear compatible with existing Distributed Control System (DCS) transfer controls. Project is a public works construction contract (prevailing wages) with DIR registration required, C-10 Electrical Contractor license, 10% bid bond, and 100% performance and payment bonds; Engineer's estimate $1,500,000; mandatory pre-bid/site visit and standard submittal and insurance requirements apply.
Posted Date
Nov 10, 2025
Due Date
Jan 8, 2026
Release: Nov 10, 2025
Close: Jan 8, 2026
SacSewer seeks contractors to remove and replace the X09 Outfall electrical switchgear at the EchoWater Resource Recovery Facility: supply, install, and integrate new switchgear compatible with existing Distributed Control System (DCS) transfer controls. Project is a public works construction contract (prevailing wages) with DIR registration required, C-10 Electrical Contractor license, 10% bid bond, and 100% performance and payment bonds; Engineer's estimate $1,500,000; mandatory pre-bid/site visit and standard submittal and insurance requirements apply.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis