Outdoor covered pavilion with bathrooms and small kitchen measuring 60 ft x 40 ft.
City of Raleigh
The project consists generally of the following major items: 1. Site preparation, erosion controls and tree protection, site and utility improvements, site grading, and hydroseeding necessary for the installation of an outdoor pavilion structure. The pavilion will be installed via a separate contract with the pavilion vendor. Site contractor will be required to coordinate schedule and work with pavilion installer throughout the project. 2. Subgrade preparation and utility connections necessary for the pavilion installation are included in this project.
Capistrano Unified School District
Procure high quality kitchen equipment and small wares at the best possible price.
Penndel Mental Health Center, Administrative Offices
4 Bathrooms Remodeled.
Release
Oct 22, 2025
Close
Nov 24, 2025