Open RFP

Or-Bandon Marsh Nwr-Bandon HVAC RFP

Description: A. Full removal of the existing Lennox outdoor heat pump and indoor air handler. B. Installation of a new heat pump and indoor air handler (HVAC unit or unit) and associated ductwork, controls, and components to provide the facility with climate control. The 1,900 SF facility requires a HVAC unit capable of providing both heating and air conditioning for the facility. Installation of the new unit should be in the same footprint as the existing unit. C. Work shall include installing new duct work if required, flue pipe, gas line, drain lines, disconnects, and associated electrical work as required to be consistent with current code. Existing ductwork and controls are in good operational condition. Contractor shall upgrade only those components that require upgrade for compatibility with the new unit. All existing ducts shall be cleaned at the completion of the project. See attached file.

Buyer
Released
Oct 20, 2026
Closes
Nov 10, 2026(16 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts