Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking a contractor to perform operation, maintenance, and monitoring (om&m) of the landfill gas collection & control system at county solid waste facility. Consists of seven (7) waste disposal units, six (6) of which are closed. All waste disposal units currently have active LFGCCS components installed. The LFGCCS consists of vertical gas extraction wells, horizontal collectors, condensate knock out sumps, a central vacuum station, one flaring unit, and various other components associated landfill gas and condensate management.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replace and reconfigure the 4 Interior Header for the landfill gas collection system at Cedar Hills Regional Landfill. The work includes decommissioning of existing HDPE piping, installation of new HDPE piping, excavation, geosynthetic repair/restoration, installation of valve assemblies, condensate, and well head controls, stormwater piping, and surface restoration.
Posted Date
Nov 7, 2025
Due Date
Jan 6, 2026
Release: Nov 7, 2025
Close: Jan 6, 2026
Replace and reconfigure the 4 Interior Header for the landfill gas collection system at Cedar Hills Regional Landfill. The work includes decommissioning of existing HDPE piping, installation of new HDPE piping, excavation, geosynthetic repair/restoration, installation of valve assemblies, condensate, and well head controls, stormwater piping, and surface restoration.
Premium
Access the largest public sector contact database
Providing curbside solid waste and recycling collection and disposal services.
Posted Date
Dec 2, 2025
Due Date
Feb 3, 2026
Release: Dec 2, 2025
Close: Feb 3, 2026
Providing curbside solid waste and recycling collection and disposal services.
AvailableProvide solid waste collection services.
Posted Date
Nov 6, 2025
Due Date
Jan 30, 2026
Release: Nov 6, 2025
Close: Jan 30, 2026
Provide solid waste collection services.
AvailableSeeks proposals for solid waste and recycling collection services.
Posted Date
-
Due Date
Jan 20, 2026
Close: Jan 20, 2026
Seeks proposals for solid waste and recycling collection services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis