Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
One (1) four-classroom building with restrooms.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Furnish and delivery of one (1) four wheel drive tractor mower with enclosed cab.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Furnish and delivery of one (1) four wheel drive tractor mower with enclosed cab.
AvailablePremium
Access the largest public sector contact database
Hospital repair water damage buildings three and four phase 1 building three.
Posted Date
-
Due Date
Dec 23, 2025
Release: -
Close: Dec 23, 2025
Hospital repair water damage buildings three and four phase 1 building three.
AvailableRelease: Dec 9, 2025
Close: Jan 14, 2026
Restrooms plumbing project.
AvailableNew concession/restroom building as a design/build project. Furnish and install 26'x26'8" block building based on floor plan provided by owner. Build on a concrete slab with 24" x 24" footer under all masonry. Install 4" block partition dividers in restrooms fully reinforced with #4 rebar, Roof will be metal framed with 26ga. Standing Seam roofing and 30# felt underlayment. Ceiling will be finished with moisture resistant drywall, Install ADA toilets in both men's and women's. Install 3 EA. metal door units with closer and louvers in bottom of each door. Install 1 heater in each restroom and concession. Install all plumbing and electrical hook ups. Install LED wrap around light fixtures.
Posted Date
Dec 1, 2025
Due Date
Jan 5, 2026
Release: Dec 1, 2025
Close: Jan 5, 2026
New concession/restroom building as a design/build project. Furnish and install 26'x26'8" block building based on floor plan provided by owner. Build on a concrete slab with 24" x 24" footer under all masonry. Install 4" block partition dividers in restrooms fully reinforced with #4 rebar, Roof will be metal framed with 26ga. Standing Seam roofing and 30# felt underlayment. Ceiling will be finished with moisture resistant drywall, Install ADA toilets in both men's and women's. Install 3 EA. metal door units with closer and louvers in bottom of each door. Install 1 heater in each restroom and concession. Install all plumbing and electrical hook ups. Install LED wrap around light fixtures.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis