Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sealed bids are requested by the City of Olivette for Olive Blvd Intersection Improvements (MoDOT Project No. SL0181) to be received at 1140 Dielman Rd, St. Louis, MO 63132 with public opening at 10:00 A.M. CST on January 13, 2026. The work includes lane widening, road resurfacing, drainage improvements, signal improvements, site grading, audible pedestrian pushbuttons, signal maintenance/programming, cable relocation, and pavement markings, among other construction tasks. Bidders must provide a 5% certified/cashier’s check or bid bond, comply with prevailing wage requirements, and obtain bid documents from the City via the bid document request form on the official buyer site.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Intersection improvements.
Posted Date
Dec 15, 2025
Due Date
Jan 22, 2026
Release: Dec 15, 2025
Close: Jan 22, 2026
Intersection improvements.
AvailableThe general items of work include, but are not limited to, removal and replacement of asphalt concrete pavement, pcc curb ramps, pcc sidewalk, pcc driveways, pcc curb & gutter, new traffic signal and street lighting system, irrigation and landscaping, adjusting utility manholes and covers, signing and striping, and other associated roadway work items.
Posted Date
Dec 3, 2025
Due Date
Jan 22, 2026
Release: Dec 3, 2025
Close: Jan 22, 2026
The general items of work include, but are not limited to, removal and replacement of asphalt concrete pavement, pcc curb ramps, pcc sidewalk, pcc driveways, pcc curb & gutter, new traffic signal and street lighting system, irrigation and landscaping, adjusting utility manholes and covers, signing and striping, and other associated roadway work items.
AvailableConstruction management and inspection services for 2016 safe routes to school project - phase I intersection safety improvements
Posted Date
Nov 24, 2025
Due Date
Jan 8, 2026
Release: Nov 24, 2025
Close: Jan 8, 2026
Construction management and inspection services for 2016 safe routes to school project - phase I intersection safety improvements
AvailableAvenue will be expanded to 5 lanes on the north and south legs of the intersection including two-through lanes and a left-turn lane at the intersection in each direction. Street will be expanded to 4 lanes in the east and west directions including a left turn lane. The intersection will have new sidewalks and ADA-compliant curb ramps on each leg of the intersection. New traffic signals will be installed on each leg of the intersection as well. In addition, new pavement striping and signage will be installed. The project also includes the milling and overlaying improvements of existing asphalt pavement with portland cement concrete for improvements at the street and avenue intersection. The project includes new traffic signals at the intersection, new sidewalks, new pavement markings and signage.
Posted Date
Dec 2, 2025
Due Date
Jan 6, 2026
Release: Dec 2, 2025
Close: Jan 6, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Avenue will be expanded to 5 lanes on the north and south legs of the intersection including two-through lanes and a left-turn lane at the intersection in each direction. Street will be expanded to 4 lanes in the east and west directions including a left turn lane. The intersection will have new sidewalks and ADA-compliant curb ramps on each leg of the intersection. New traffic signals will be installed on each leg of the intersection as well. In addition, new pavement striping and signage will be installed. The project also includes the milling and overlaying improvements of existing asphalt pavement with portland cement concrete for improvements at the street and avenue intersection. The project includes new traffic signals at the intersection, new sidewalks, new pavement markings and signage.