Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of the interior and exterior painting and tank repair work of the 1,000,000 gallon elevated water tank.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
2026 water tank sandblasting and painting-arrowhead 1,000,000 gallon ground tank.
Posted Date
Dec 20, 2025
Due Date
Jan 29, 2026
Release: Dec 20, 2025
Close: Jan 29, 2026
2026 water tank sandblasting and painting-arrowhead 1,000,000 gallon ground tank.
AvailableThe City of Cotter, Arkansas is soliciting proposals for painting and rehabilitation of two water storage tanks (a 90x30 welded steel standpipe and a 12x44' riveted ground storage tank). Firms must provide a price for rehabilitation of each tank and submit sealed proposals with a 5% bid bond; proposals must be mailed or delivered to Cotter City Hall. The City reserves the right to waive formalities and reject any or all proposals; the RFP/specifications are available from the Cotter Mayor (mayor@cotterar.gov) or at City Hall.
Posted Date
Dec 7, 2025
Due Date
Jan 27, 2026
Release: Dec 7, 2025
Close: Jan 27, 2026
The City of Cotter, Arkansas is soliciting proposals for painting and rehabilitation of two water storage tanks (a 90x30 welded steel standpipe and a 12x44' riveted ground storage tank). Firms must provide a price for rehabilitation of each tank and submit sealed proposals with a 5% bid bond; proposals must be mailed or delivered to Cotter City Hall. The City reserves the right to waive formalities and reject any or all proposals; the RFP/specifications are available from the Cotter Mayor (mayor@cotterar.gov) or at City Hall.
AvailableRehabilitate the Lakeville ground storage tank coating system, perform miscellaneous tank repairs, install a new asphalt driveway, plant, and complete site improvements.
Posted Date
Dec 1, 2025
Due Date
Jan 15, 2026
Release: Dec 1, 2025
Close: Jan 15, 2026
Rehabilitate the Lakeville ground storage tank coating system, perform miscellaneous tank repairs, install a new asphalt driveway, plant, and complete site improvements.
AvailableImprove and rehabilitate elevated water storage tank. The work includes cleaning, sandblasting, power tool cleaning, including proper handling and disposal of spent blast residue and other material, performing repairs and modifications to steel components, coordinating with corrpro and installing any required cathodic protection system components, and painting the interior and exterior of a 1,500,000 gallon fluted column elevated water storage tank. The work also includes disinfection and sampling as required to place the elevated tank back in service, as well as proper containment of blast and paint residue and clean-up of the site. Interior painting complete (dry area) 1 ls, waste disposal - non hazardous 550 ton, waste disposal - hazardous 50 tom, see attached file.
Posted Date
Dec 19, 2025
Due Date
Jan 21, 2026
Release: Dec 19, 2025
Close: Jan 21, 2026
Improve and rehabilitate elevated water storage tank. The work includes cleaning, sandblasting, power tool cleaning, including proper handling and disposal of spent blast residue and other material, performing repairs and modifications to steel components, coordinating with corrpro and installing any required cathodic protection system components, and painting the interior and exterior of a 1,500,000 gallon fluted column elevated water storage tank. The work also includes disinfection and sampling as required to place the elevated tank back in service, as well as proper containment of blast and paint residue and clean-up of the site. Interior painting complete (dry area) 1 ls, waste disposal - non hazardous 550 ton, waste disposal - hazardous 50 tom, see attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →