Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Oakdale Irrigation District (OID) seeks construction of a new agricultural groundwater well (OID Howard Deep Well #2) to an approximate depth of 480 feet. The solicitation excludes furnishing and installation of pumping equipment and electrical work, which will be performed by others. Bids must be submitted via PublicPurchase and are due prior to 2:00 pm on Monday, March 9, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of water reclamation facility deep injection well equipping and conveyance. Work includes approx 2 EA injection well annulus system. See outside link.
Posted Date
Dec 30, 2025
Due Date
Feb 12, 2026
Release: Dec 30, 2025
Close: Feb 12, 2026
Project consists of water reclamation facility deep injection well equipping and conveyance. Work includes approx 2 EA injection well annulus system. See outside link.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the installation of erosion and sediment control facilities, a 350 LF 18 inch C900 DR 18 PVC water main, 1 fire hydrant assembly, pavement removal and replacement, connection to existing water mains, and appurtenances. It also includes the installation of one 1250 GPM Deep Well pump, chlorine equipment, pump house, electrical items, meter, piping, and telemetry system.
Posted Date
Jan 28, 2026
Due Date
Mar 4, 2026
Release: Jan 28, 2026
Close: Mar 4, 2026
This RFP is for the installation of erosion and sediment control facilities, a 350 LF 18 inch C900 DR 18 PVC water main, 1 fire hydrant assembly, pavement removal and replacement, connection to existing water mains, and appurtenances. It also includes the installation of one 1250 GPM Deep Well pump, chlorine equipment, pump house, electrical items, meter, piping, and telemetry system.
AvailableConstruction of the Northeast Water Reclamation Facility Deep Injection Well Equipping and Conveyance Project.
Posted Date
Dec 29, 2025
Due Date
Feb 12, 2026
Release: Dec 29, 2025
Close: Feb 12, 2026
Construction of the Northeast Water Reclamation Facility Deep Injection Well Equipping and Conveyance Project.
AvailableProject consists of construction of Public Water Supply Well No. 5, and the Well No. 5 Pumphouse, completion of SCADA system updates, abandonment of Well No. 2, and demolition of the Well No. 2 Pumphouse. Contract A - Public Water Supply Well No. 5: Construction of a 1,200 gallon per minute (gpm) municipal well to a depth of 106 feet, well development, performance pump testing of constructed well, WDNR NR 809 water quality analysis, erosion control restoration of the work area, and other miscellaneous items in conformance with the Contract Documents. Contract B - Well No. 5 Pumphouse, SCADA Updates & Demolition of Well No. 2 Pumphouse: Construction of the Well No. 5 Pumphouse building, including furnishing and installing all well pump equipment, piping, valves, accessories and controls. The building includes a pump room, chemical room, and restroom. The Well No. 5 Pumphouse contract also includes installation of a natural gas-powered emergency electrical generator, erosion control measures, site work, site piping, driveway, pavement, restoration of the work area, pump testing, water quality testing, and other miscellaneous items in conformance with the Contract Documents. Also, to include demolition of the Well No. 2 Pumphouse including building demolition, excavation, water main and other utilities disconnections/abandonments, backfilling, grading, and site restoration. The existing Well No. 2 motor control center and well pump equipment are to be salvaged and reused in the proposed Well No. 5 Pumphouse. Well No. 2 is to be abandoned including removal and off-site disposal, or salvaging for the Owner, of existing well pump, column pipe, electrical cables, and motor, removing the casing to 3 feet below final finish grade, filling with concrete, neat cement grout or approved bentonite chips, and submitting a Well/Drillhole Abandonment Report. In addition, the project includes SCADA system updates which include removal and disposal of existing SCADA system equipment and installation of new equipment at the existing Well Nos. 1, 3, & 4, pumphouses, reservoirs site, and the proposed Well No. 5 Pumphouse.
Posted Date
Jan 8, 2026
Due Date
Feb 10, 2026
Release: Jan 8, 2026
Close: Feb 10, 2026
Project consists of construction of Public Water Supply Well No. 5, and the Well No. 5 Pumphouse, completion of SCADA system updates, abandonment of Well No. 2, and demolition of the Well No. 2 Pumphouse. Contract A - Public Water Supply Well No. 5: Construction of a 1,200 gallon per minute (gpm) municipal well to a depth of 106 feet, well development, performance pump testing of constructed well, WDNR NR 809 water quality analysis, erosion control restoration of the work area, and other miscellaneous items in conformance with the Contract Documents. Contract B - Well No. 5 Pumphouse, SCADA Updates & Demolition of Well No. 2 Pumphouse: Construction of the Well No. 5 Pumphouse building, including furnishing and installing all well pump equipment, piping, valves, accessories and controls. The building includes a pump room, chemical room, and restroom. The Well No. 5 Pumphouse contract also includes installation of a natural gas-powered emergency electrical generator, erosion control measures, site work, site piping, driveway, pavement, restoration of the work area, pump testing, water quality testing, and other miscellaneous items in conformance with the Contract Documents. Also, to include demolition of the Well No. 2 Pumphouse including building demolition, excavation, water main and other utilities disconnections/abandonments, backfilling, grading, and site restoration. The existing Well No. 2 motor control center and well pump equipment are to be salvaged and reused in the proposed Well No. 5 Pumphouse. Well No. 2 is to be abandoned including removal and off-site disposal, or salvaging for the Owner, of existing well pump, column pipe, electrical cables, and motor, removing the casing to 3 feet below final finish grade, filling with concrete, neat cement grout or approved bentonite chips, and submitting a Well/Drillhole Abandonment Report. In addition, the project includes SCADA system updates which include removal and disposal of existing SCADA system equipment and installation of new equipment at the existing Well Nos. 1, 3, & 4, pumphouses, reservoirs site, and the proposed Well No. 5 Pumphouse.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →