Summary
Invitation for Bid issued by the Vashon Park District to fully replace the roof of the Ober Administration Building; scope includes removal of the existing roofing system, installation of a new single-ply PVC membrane, replacement of flashing, minor exterior repairs, and provision of a 10-year manufacturer warranty. The project requires compliance with Washington prevailing-wage requirements, specified insurance limits, and completion within a two-week window in September 2026; a mandatory site visit is scheduled for June 29, 2026 and questions are due July 10, 2026. Bids are open (posted 2026-06-22) and due by July 14, 2026; estimated contract value is roughly $70,000–$85,000 per the solicitation materials.