Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking proposals from a New York State Licensed Architect/Engineer to provide consulting services to construct a Live Fire Training Facility.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of a new live fire training facility. The Fire Rescue live fire training facility shall be a 3 story structure erected from (11) New (One Trip) shipping containers. Due to site constraints and existing septic lines, the overall footprint of the structure will have to be built in an (L) shape to maximize the facilities’ function. The short side of the L shape will consist of (6) containers stacked (3) base, (2) second story, (1) third story and measure 40 feet from end to end. The long side of the L shape will consist of (5) containers, joined perpendicular to the short side, (3) base, (2) second floor, and measure 66 feet from end to end. The interior of the containers will be modified to simulate the interior of a residential structure.
Posted Date
Nov 6, 2025
Due Date
Jan 2, 2026
Release: Nov 6, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 2, 2026
Construction of a new live fire training facility. The Fire Rescue live fire training facility shall be a 3 story structure erected from (11) New (One Trip) shipping containers. Due to site constraints and existing septic lines, the overall footprint of the structure will have to be built in an (L) shape to maximize the facilities’ function. The short side of the L shape will consist of (6) containers stacked (3) base, (2) second story, (1) third story and measure 40 feet from end to end. The long side of the L shape will consist of (5) containers, joined perpendicular to the short side, (3) base, (2) second floor, and measure 66 feet from end to end. The interior of the containers will be modified to simulate the interior of a residential structure.
AvailableThe Commonwealth of Kentucky, through its Finance and Administration Cabinet, Department for Facilities and Support Services, is soliciting an Architect/Engineer to provide architectural and engineering services for the development and construction of a Readiness Center in Somerset, KY. The A/E will provide schematic design, design development, contract documents, and construction administration, including site surveys, consultant coordination, regulatory compliance, and assistance with LEED certification if applicable. The contract period runs from execution through substantial completion; bidders must be licensed to practice in Kentucky and follow the Owner's procedures and document collaboration system.
Posted Date
Dec 11, 2025
Due Date
Jan 8, 2026
Release: Dec 11, 2025
Close: Jan 8, 2026
The Commonwealth of Kentucky, through its Finance and Administration Cabinet, Department for Facilities and Support Services, is soliciting an Architect/Engineer to provide architectural and engineering services for the development and construction of a Readiness Center in Somerset, KY. The A/E will provide schematic design, design development, contract documents, and construction administration, including site surveys, consultant coordination, regulatory compliance, and assistance with LEED certification if applicable. The contract period runs from execution through substantial completion; bidders must be licensed to practice in Kentucky and follow the Owner's procedures and document collaboration system.
AvailableProvide professional engineering services to assist the port engineer in providing testing, inspection, and construction quality assurance and project management services on the port.
Posted Date
Dec 3, 2025
Due Date
Jan 14, 2026
Release: Dec 3, 2025
Close: Jan 14, 2026
Provide professional engineering services to assist the port engineer in providing testing, inspection, and construction quality assurance and project management services on the port.
AvailableProvide licensed real estate brokerage marketing services.
Posted Date
Dec 15, 2025
Due Date
Jan 16, 2026
Release: Dec 15, 2025
Close: Jan 16, 2026
Provide licensed real estate brokerage marketing services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →