Posted
Nov 13, 2026
Nov 27, 2027
NSN: 6130-01-674-7138 Power Supply (Request for Proposal)
Power supply, NSN: 6130-01-674-7138.
Description: Pre-Solicitation Synopsis: This is not an official Request For Proposal (RFP). Any offer received in response to this Synopsis will not be considered. Offerors are instructed to respond to the forthcoming RFP, when released. DLAWS (Warren) proposes to award a New Five-Year Firm Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ) contract to an offeror providing the product of: North Atlantic Industries, Commercial and Government Entity (CAGE) 0VGU1, 116 Wilbur PL, Bohemia, New York, 11716, the approved source for National Stock Number (NSN) 6130-01-674-7138, 400 Hz Power Supply Line Replaceable Module. Requirements Description: The Power Supply is a circuit card within the Mission Control Unit (MCU). The Power Supply LRM converts the vehicle's prime power to an isolated and regulated alternating 26Vrms 400Hz output to supply the M1A2 SEPv3 Abrams tank electrical system. It is a critical item of the M1A2 SEPv3 Abrams tank power and electrical system. The Government does not have drawings for this item that are suitable for competitive procurement. The TDP is fully defined, but the government does not have full data rights. Contractors interested in becoming a source of supply need to meet the requirements of the Source Approval Program including vehicle level qualification testing, at their own expense. The TACOM Life Cycle Management Command, Competition Management Office (CMO), is the lead proponent for the Source Approval Program. Specific information and point of contact for the Source Approval Program is available at https://tacom.army.mil/ and select Ombudsman from the menu.
Federal · US
Adjacent opportunities open for bidding right now.
Posted
Nov 13, 2026
Nov 27, 2027
Power supply, NSN: 6130-01-674-7138.
Federal
Posted
Nov 16, 2026
Nov 24, 2026
Contract Specialist: Logan McLaughlin Email: Logan.McLaughlin@dla.mil NSN : 6130-01-308-7643 Approved Source(s): ROCKWELL COLLINS, INC DBA RC (09344) P/N: 0102-0015 CENTROID INC (21856) P/N: PC74051-3 ___ The AMC/AMSC for the NSN listed above is 2 B AMC 2. Suitable for competitive acquisition for the first time. AMSC B. This part must be acquired from a manufacturing source(s) specified on a source control or selected item drawing as defined by the current version of DoD-STD-100. Suitable technical data, Government data rights, or manufacturing knowledge are not available to permit acquisition from other sources, nor qualification testing of another part, nor use of a second source part in the intended application. Although, by DoD-STD-100 definition, altered and selected items shall have an adequate technical data package, data review discloses that required data or data rights are not in Government possession and cannot be economically obtained. If one source is available, AMCs 3, 4, or 5 are valid. If at least two sources exist, AMCs 1 or 2 are valid. Please review the NSN listed above and provide any sources that may be able to manufacture these items. The approved sources for this NSN are currently listed above. All information may be submitted directly to the Contract Specialist listed above. This information must be provided by the response date indicated above. Should a company wish to be reviewed and qualified as an Approved Source, they may submit an application package through the DLA Land and Maritime Alternate Offer/Source Approval Request (SAR) Program. A SAR package contains all technical data needed to demonstrate that the prospective contractor can competently manufacture the product to the same level of quality or better than the Original Equipment Manufacturer (OEM). The onus is on the contractor to document and demonstrate their product is equal to, or better, than the currently approved item which DLA Land and Maritime is procuring. For further information, please reference the DLA Land Maritime web page shown below and click on the highlight: Alternate Offer/Source Approval Program for detailed explanation for the information and format necessary for a SAR and for the SAR approval process. https://www.dla.mil/Land-and-Maritime/Business/Selling/Alternate-Offers/ Thank you in advance for your assistance.
FederalVA
Posted
Nov 16, 2026
Nov 23, 2026
DLA Land and Maritime seeks information from potential manufacturers for power supply NSN 6130-01-308-7643, with responses due November 23, 2026. The notice identifies Rockwell Collins, Inc. and Centroid Inc. as approved sources and explains that government technical data or data rights are unavailable to qualify other sources. Interested firms may submit manufacturer information to the contract specialist by the response date or apply for approval through DLA’s Source Approval Request program.
Posted
Nov 13, 2026
Nov 23, 2026
1 - SF 1449 is amended as follows: a) Block 20 - "30 days" is changed to "60 days" b) Block 28 is checked, quoter to sign and return 1 copy; quoters must sign block 30 and return to the CO c) Block 27a - FAR52.212-3 and FAR 52.212-5 were rescinded with the FAR Overhaul and are not applicable to this solicitation. 2 Section B.1 Invoices Paragraph 3(c) is changed to read: Other [X] After Acceptance. 3 Additional Requirements (page 7) is replaced as follows (affected words underlined). The product manufacturer s date cannot exceed 24 months (2 years) before the purchase order award date. The equipment must be unused and not refurbished, and it shall have the latest software and hardware updates installed by the manufacturer. Batteries included with the unit must have been manufactured within 6 (six) months of the purchase order award date. Service Manuals, including the theory of operation, maintenance requirements, repair information, schematics, part lists, and troubleshooting details, will be provided to the VA HTM Department in electronic format within three (3) days of delivery. Warranty information regarding parts and labor must be provided for all procured products in electronic format. Documentation must be sent to both the IOT&A contractor and the VA HTM Department within three (3) days of delivery. 4 Note on purchase order award date The government anticipates making the purchase order award in early December 2026. 5 Confidentiality and Non-Disclosure There was a discrepancy in original text. This amendment confirms that a Security Accreditation Package is not required. 6 Delivery Schedule - In the unlikely event of VA activation team delay that would impact the delivery schedule, the VA will provide 30-days notice of such delay. 7 - VAAR 852.219-77 and 852.219-78 do not apply to this solicitation since a subcontracting plan is not required. 8 - Regarding VAAR 852.239-75, Section 508 documentation is not required for this solicitation. 8 VAAR 852.247-74 is modified to read shipping line items 0001 and 0002 There are no other changes to this clause. ** End of Amendment 0001 to Solicitation 36C25027Q0037 **
Original attachments and procurement documents tied to this bid.