Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Nampa School District is soliciting proposals to replace the data cable plant at its Roosevelt campus. The bid package includes NSD cable specifications and plan sheets (rack layout, MDF/IDF, demo, and floor plans). An optional building walkthrough is offered on January 30, 2026, and proposals are due on February 12, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Nampa School District is soliciting proposals to replace the data cable plant at Owyhee, including installation per provided plans and specifications. A set of bid documents and plans (specifications, rack layout, MDF/IDF, demo plan, floor plan) are available from the buyer’s posting. A non-mandatory building walkthrough is scheduled for 2026-01-30 and proposals are due 2026-02-12.
Posted Date
Dec 29, 2025
Due Date
Feb 13, 2026
Release: Dec 29, 2025
Close: Feb 13, 2026
The Nampa School District is soliciting proposals to replace the data cable plant at Owyhee, including installation per provided plans and specifications. A set of bid documents and plans (specifications, rack layout, MDF/IDF, demo plan, floor plan) are available from the buyer’s posting. A non-mandatory building walkthrough is scheduled for 2026-01-30 and proposals are due 2026-02-12.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Nampa School District issued an Invitation for Bid (RFB-NSD-IT-NE-Fiber-2026-0-2026/CK) for the NSD New Horizons Fiber Upgrade to replace old fiber runs across district facilities. The bid package (NSD Cable Specifications, NE Fiber Pathway, 2025 NE Fiber RFP) is available for download from the buyer posting and a non-mandatory building walkthrough is scheduled for 2026-02-06 at 8:00 AM MST (schedule with Sherri McIlhargey). The solicitation is an RFB (not a grant), was broadcast 2025-12-29, and closes 2026-02-12, and thus is open on 2025-12-31.
Posted Date
Dec 29, 2025
Due Date
Feb 13, 2026
Release: Dec 29, 2025
Close: Feb 13, 2026
Nampa School District issued an Invitation for Bid (RFB-NSD-IT-NE-Fiber-2026-0-2026/CK) for the NSD New Horizons Fiber Upgrade to replace old fiber runs across district facilities. The bid package (NSD Cable Specifications, NE Fiber Pathway, 2025 NE Fiber RFP) is available for download from the buyer posting and a non-mandatory building walkthrough is scheduled for 2026-02-06 at 8:00 AM MST (schedule with Sherri McIlhargey). The solicitation is an RFB (not a grant), was broadcast 2025-12-29, and closes 2026-02-12, and thus is open on 2025-12-31.
AvailableProcurement of services for remediation of existing network cabling infrastructure, including removal of unused cabling, effective cable management, and correct cable connection.
Posted Date
Dec 9, 2025
Due Date
Jan 8, 2026
Release: Dec 9, 2025
Close: Jan 8, 2026
Procurement of services for remediation of existing network cabling infrastructure, including removal of unused cabling, effective cable management, and correct cable connection.
Remediation of existing network cabling infrastructure. Removal of unused cabling, implementation of effective cable management, and ensuring all cables are correctly connected. The goal of the remediation is enhance the network s performance and longevity.
Posted Date
Dec 9, 2025
Due Date
Jan 8, 2026
Release: Dec 9, 2025
Close: Jan 8, 2026
Remediation of existing network cabling infrastructure. Removal of unused cabling, implementation of effective cable management, and ensuring all cables are correctly connected. The goal of the remediation is enhance the network s performance and longevity.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →