Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the demolition of an existing Air Handling Unit and installation of a new unit in the McGee Building on the Lynn Campus. The new AHU-3 will be tied into an existing system with two other existing AHU's that were replaced in 2022.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Waukegan Public Library is soliciting sealed lump-sum bids for the AHU (HVAC) Replacement Project at its facility. A non-mandatory walkthrough is scheduled for January 20, 2026 at 9:00 AM, and a 10% bid bond is required. Sealed bids are due by 10:00 AM on February 10, 2026 at Waukegan Public Library, after which they will be publicly opened and read.
Posted Date
-
Due Date
Feb 10, 2026
Close: Feb 10, 2026
Waukegan Public Library is soliciting sealed lump-sum bids for the AHU (HVAC) Replacement Project at its facility. A non-mandatory walkthrough is scheduled for January 20, 2026 at 9:00 AM, and a 10% bid bond is required. Sealed bids are due by 10:00 AM on February 10, 2026 at Waukegan Public Library, after which they will be publicly opened and read.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the removal of eight air handling units and replacing them with six air handling units. Hot water heating piping will be modified to accommodate the AHU replacement.
Posted Date
Jan 13, 2026
Due Date
Jan 29, 2026
Release: Jan 13, 2026
Close: Jan 29, 2026
Project includes the removal of eight air handling units and replacing them with six air handling units. Hot water heating piping will be modified to accommodate the AHU replacement.
AvailableThis project consists of replacing 7 HVAC systems in occupied apartments.
Posted Date
Jan 18, 2026
Due Date
Feb 16, 2026
Release: Jan 18, 2026
Close: Feb 16, 2026
This project consists of replacing 7 HVAC systems in occupied apartments.
AvailableThe City of Union City is requesting proposals for mechanical engineering design services for the Mark Green Sports Center AHU Replacement Project, including design for new air conditioning units, associated mechanical, electrical, controls, and structural elements, and construction support.
Posted Date
Jan 8, 2026
Due Date
Jan 27, 2026
Release: Jan 8, 2026
Close: Jan 27, 2026
The City of Union City is requesting proposals for mechanical engineering design services for the Mark Green Sports Center AHU Replacement Project, including design for new air conditioning units, associated mechanical, electrical, controls, and structural elements, and construction support.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →